1.大野義男、江瑞坤 (2014),精實現場管理: 豐田生產方式資深顧問親授40年現場管理實務。財團法人中衛發展中心。
2.王明揚、林迪意 (譯) (2015)。工作研究。台北市:麥格羅希爾。(Andris Freivalds., & Benjamin W.Niebel., (2013)
3.王國臣、王健全、陳信宏、劉孟俊 (2020)。後 COVID-19 疫情時代臺灣經濟課題與因應(編號:109026.0206)。國家發展委員會
4.江瑞坤、大野義男、侯東旭 (2011)。豐田的三位一體生產系統。財團法人中衛發展中心。
5.長田貴 (1996)。親自動手的管理手法—5S。財團法人中衛發展中心。
6.張殷豪 (2017)。運用系統模擬技術探討醫療級鈦金屬材料於理貨中心之儲位規劃研究(國立中山大學資訊管理學系),碩士論文。7.張清波 (2008). TPS, 精實生產, 精實六標準差. 品質月刊, 44(3), 16-22.
8.經濟部中小企業處 (2022)。110年中小企業重要統計表。線上檢索日期 : 2022年11月15日。網址 : https://www.moeasmea.gov.tw/article-tw-2344-8162
9.賴柏言, & 張清波 (2021)。漫談 [精實屋] 革新找尋自身最合適的改善技法。品質月刊, 57(6), 6-13.
10.Akindipe, O. S. (2014). The role of raw material management in production operations. International Journal of Managing Value and Supply Chains, 5(3), 37.
11.Almeida, D. D., & Ferreira, J. (2009). Analysis of the Methods Time Measurement (MTM) methodology through its application in manufacturing companies. Flexible Automation and Intelligent Manufacturing, 1, 2-9.
12.Bamber, C. J., Sharp, J. M., & Hides, M. T. (2000). Developing management systems towards integrated manufacturing:a case study perspective. Integrated Manufacturing Systems.
13.Barnes, R. M. (1980). Motion and Time study Design and Measurement of work John wiley & Sons. 1980.
14.Bayo‐Moriones, A., Bello‐Pintado, A., & de Cerio, J. M. D. (2010). 5S use in manufacturing plants: contextual factors and impact on operating performance. International Journal of Quality & Reliability Management.
15.Bures, M., & Pivodová, P. (2013, December). Comparison of the predetermined time systems MTM-1 and BasicMOST in assembly production. In 2013 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 546-550). IEEE.
16.Bures, M., & Pivodova, P. (2015). Comparison of time standardization methods on the basis of real experiment. Procedia Engineering, 100, 466-474.
17.Cantore、Hartwich、Lavopa、Haverkamp、Laplane 、Rodousakis. (2020). Coronavirus: the economic impact 10 July 2020. UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION. Retrieved November 16,2022 from the World Wide Web:https://www.unido.org/stories/coronavirus-economic-impact-10-july-2020
18.Demeter, K., & Matyusz, Z. (2011). The impact of lean practices on inventory turnover. International journal of production economics, 133(1), 154-163.
19.Genaidy, A. M., Agrawal, A., & Mital, A. (1990). Computerized predetermined motion-time systems in manufacturing industries. Computers & Industrial Engineering, 18(4), 571-584.
20.Grosfeld-Nir, A., Ronen, B., & Kozlovsky, N. (2007). The Pareto managerial principle: when does it apply?. International Journal of Production Research, 45(10), 2317-2325.
21.Ho, S. K., & Cicmil, S. (1996). Japanese 5‐S practice. The TQM magazine.
22.Karger, D. W., & Hancock, W. M. (1982). Advanced work measurement. Industrial Press.
23.Keskin, G. A., Çolak, M., Çelik, B., & Avcı, S. (2016). Metot Zaman Ölçümü (MZÖ) yöntemi ile üretim süresinin iyileştirilmesi:beyaz eşya yan sanayisinde bir uygulama. Sakarya University Journal of Science, 20(3), 417-424.
24.Koch, R. (2011). The 80/20 Principle:The Secret of Achieving More with Less:Updated 20th anniversary edition of the productivity and business classic. Hachette UK.
25.Maynard, H. B., Stegemerten, G. J., & Schwab, J. L. (1948). Methods-time measurement.
26.MTM ASSOCIATION e. V (1978). MTM-MEK Grundvorgänge. Author. Retrieved June 13,2022 from the World Wide Web: https://mtm.org/fileadmin/mtm_upload/Download/MTM-MEK_Datenkarte_DE.pdf
27.Niebel, B. W. (1988). Motion and time study, Richard D. Irwin. Inc., Homewood, 111, 19553.
28.Ohno, T. (1988), in Dillon, A.P. (Ed.), Workplace Management, Productivity Press, Cambridge, MA.
29.Ronen, B., Spiegler, I., & Kozlovsky, N. (2005). The use, misuse and abuse of the Pareto principle. Working paper.
30.Sakakibara, S., Flynn, B. B., Schroeder, R. G., & Morris, W. T. (1997). The impact of just-in-time manufacturing and its infrastructure on manufacturing performance. Management Science, 43(9), 1246-1257.
31.Smith, R., & Peterson, J. R. (2001). The 5S pocket guide. New York: Quality Resources.
32.Srajer, V., Miller, A., & Simon, M. (2010). IMPORTANCE OF THE PROPOSAL LAYOUT FOR INCREASING COMPETITIVENESS ENTERPRISE. Annals of DAAAM & Proceedings, 21, 1.
33.Sundar, R., Balaji, A. N., & Kumar, R. S. (2014). A review on lean manufacturing implementation techniques. Procedia Engineering, 97, 1875-1885.
34.Womack, J. P., Jones, D. T., & Roos, D. (1990). The machine that change the world. Rawson Associates, NY.
35.Zandin, kjell B. MOST Work Measurement System. New York: Marcel Dekker, 1980