英文部分
1、Aiyetan, O. A., and Dillip, D., 2018, “System Dynamics Approach to Mitigating Skilled Labour Shortages in the Construction Industry: A South African Context”, Construction Economics and Building, Vol.18, No.4, pp.45-63.
2、Arditi, D., et al, 2017, “Effect of organizational culture on delay in construction”, Internationl Journal of Project Management, Vol.35, pp.136-147.
3、Bajjou, M.S., and Chafi, A., 2018, “Empirical study of schedule delay in Moroccanconstruction projects”, International Journal of Construction Management, DOI:10.1080/15623599.2018.1484859.
4、Das, D. K., and Emuze, F., 2016, “A Dynamic Model Of Contractor Induced Delays In India”, Journal of Construction in Developing Countries., Vol.22, No.4, pp.21-39.
5、Dixit, S., et al, 2017, “A Study of Enabling factors affecting construction productivity: Indian scnerio”, Internationl Journal of Civil Engineering and Technology, Vol.8(6), pp.741-758.
6、Goodman, M., 1997, “Systems Thinking:What, Why, When, Where, and How? ”, System Thinker, Vol.8, No.2, https://thesystemsthinker.com/systems-thinking-what-why-when-where-and-how/.
7、Kog, Y. C., et al, 1999, “Key determinants for construction schedule performance”, Internationl Journal of Project Management, Vol.17, No.6, pp.351-359.
8、Larsen, J. K., et al, 2016, “Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects”, Journal of Management in Engineering, Vol. 32-1, DOI:10.1061/(ASCE)ME.1943-5479.0000391.
9、Love, P. E. D., et al, 2020, “MiDiCON:A model for Mitigating Delays in Construction”, Paper presented at the 1st International Conference on Systems Thinking in Management, pp.8-10.
10、Megha, D., and Rajiv, B., 2013, “A Methodology for Ranking of Causes of Delay for Residential Construction Projects in Indian Context”, International Journal of Emerging Technology and Advanced Engineering, Vol.3(3), pp.396-404.
11、Sanvido, V. E., 1988, “Conceptual Construction Process Models”, Journal of Construction Engineering and Management, Vol.114(2), pp294-310.
12、Sanvido, V. E., and Pauson, B. C., 1991, “Site analysis using controller function chart”, Journal of Construction Engineering and Management, Vol. 117, No. 2.
13、Yang, J.B., and Wei, P.R., 2010, “Causes of Delay in the Planning and Design Phases for Construction Projects”, Journal of architectural engineering, Vol.16, No.2, pp.80-83.
14、Yap, J. B. H., et al, 2019, “Systemic View to Understanding Design Change Causation and Exploitation of Communications and Knowledge”, Project Management Journal, Vol. 50, No.3, pp.288-305.
15、Zidane, Y.J.T., and Andersen, B., 2018, “The top 10 universal delay factors in construction projects”, International Journal of Managing Projects in Business, DOI: 10.1108/IJMPB-05-2017-0052.
中文部分
1、Peter M. Senge著,郭進隆、齊若蘭譯,2010,第五項修練(全新增訂版) : 學習型組織的藝術與實務,第三版,遠見天下文化發行。
2、王文榮,2014,以系統思考研究機電與土建工程介面問題的本質。國立高雄第一科技大學營建工程系,碩士論文。3、朱柔若譯,2000,社會研究方法:質化與量化取向,初版,揚智發行。譯自 W. Lawrence Neuman. Social Research Methods: Qualitative and Quantitative Approaches, 3rd edition. Boston: Allyn and Bacon. 1997
4、李俊謙,2016,以系統思考探討工班生產力-案例研究。國立高雄第一科技大學,碩士論文。5、林文程,2005,方法論-社會科學研究方法。國立政治大學中國大陸研究中心。
6、林建良、譚海林,2011,台灣造船產業工程延遲原因之研究,中國造船暨輪機工程學刊第三十卷第三期,民國100年8月。
7、林伯儒,2016,營建工程進度延遲因素之研究。國立金門大學,碩士論文。8、周雅如,2006,應用控制功能表於營建專案組織規劃之研究。國立高雄第一科技大學,碩士論文。9、張芳全,2008,問卷就是要這樣編。心理出版社股份有限公司。
10、屠益民、張良政,2010,系統動力學:理論與應用,初版,智勝發行。
11、楊文賓,2008,汙下水道工程時程延遲原因量化分析。中華大學,碩士論文。12、趙佩玉,2015,以系統思考探討台灣營造業職業安全衛生教育訓練之研究。國立高雄第一科技大學,碩士論文。
13、蔡耀德,2016,工廠建廠現場管理之研究-以台灣中油油槽設廠為例,國立高雄應用科技大學,碩士論文。14、賴玉樹,2007,水利工程施工階段時程延遲原因之分析。國立雲林科技大學,碩士論文。15、魏彣芯,2020,國內公共工程專案時程管理規範之研究,國立中央大學,碩士論文。