沈優錢,2004。製造生產人力排班最佳化之研究,國立中央大學土木工程研究所碩士論文。林威岳,2007。生產線之生產人力彈性運用探討,國立中山大學人力資源管理研究所碩士論文。陳軍凱,2005。隨機需求下航空貨物收貨員工人力供給暨班次表設計規劃之研究,國立中央大學土木工程研究所碩士論文。黃楚詒,2017。開發混合型員工排班模型,國立高雄第一科技大學運籌管理所碩士論文。黃錦泰,1999。組織背景因素與組織規章對於企業人力彈性運用影響之研究,國立中山大學企業管理研究所碩士論文。
蔡孟緯,2004。工廠排班最佳化模式之研究以一 LED 藍寶石基板廠為例,國立中央大學土木工程研究所碩士論文。謝育倫,2008。生產線人員排班最佳化模式之個案研究以IC最終測試廠為例,國立交通大學管理學院(資訊管理學程)碩士論文。Abernathy, W. J., Baloff, N., Hershey, J. C., & Wandel, S. (1973). A three-stage manpower planning and scheduling model—a service-sector example. Operations Research, 21(3), 693-711.
Atkinson, J. (1984). Manpower strategies for flexible organisations. Personnel management, 16(8), 28-31.
Aykin, T. (1996). “Optimal shift scheduling with multiple break windows.” Management Science, 42(4), 591-602.
Bechtold, S. E., Brusco, M. J., & Showalter, M. J. (1991). A comparative evaluation of labor tour scheduling methods. Decision Sciences, 22(4), 683-699.
Bechtold, S. E., & Jacobs, L. W. (1996). “The equivalence of general set‐covering and implicit integer programming formulations for shift scheduling.” Naval Research Logistics (NRL), 43(2), 233-249.
Blyton, P., & Morris, J. (1992). HRM and the limits of flexibility. Reassessing human resource management, 116-130.
Blyton, P. A. U. L. (1996). Workforce flexibility. The Handbook of Human Resource Management.
Campbell, G. M. (1999). Cross-utilization of workers whose capabilities differ. Management Science, 45(5), 722-732.
Costa, G. (1997). “The problem: shiftwork.” Chronobiology international, 14(2), 89-98.
Dantzig, G. B. (1954). “Letter to the editor—A comment on Edie's “Traffic delays at toll booths”.” Journal of the Operations Research Society of America, 2(3), 339-341.
De Causmaecker, P., Demeester, P., Berghe, G. V., & Verbeke, B. (2004). “Analysis of real-world personnel scheduling problems.” In Proceedings of the 5th international conference on practice and theory of automated timetabling, Pittsburgh (pp. 183-197).
Dorne, R. (2008). “Personnel shift scheduling and rostering.” In Service chain management (pp. 125-138). Springer, Berlin, Heidelberg.
Edie, L. C. (1954). “Traffic delays at toll booths.” Journal of the operations research society of America, 2(2), 107-138.
Ernst, A. T., Jiang, H., Krishnamoorthy, M., & Sier, D. (2004). Staff scheduling and rostering: A review of applications, methods and models. European journal of operational research, 153(1), 3-27.
Ghiani, G., Guerriero, E., Manni, A., Manni, E., & Potenza, A. (2013). “Simultaneous personnel and vehicle shift scheduling in the waste management sector.” Waste management, 33(7), 1589-1594.
Knauth, P. (1993). “The design of shift systems.” Ergonomics, 36(1-3), 15-28.
Knauth, P. (1996). “Designing better shift systems.” Applied ergonomics, 27(1), 39-44.
Knauth, P., & Hornberger, S. (2003). “Preventive and compensatory measures for shift workers.” Occupational medicine, 53(2), 109-116.
Lagodimos, A. G., Charalambopoulos, A., & Kavgalaki, A. (1996). Computer-aided packing shop scheduling in a manufacturing plant. International journal of production economics, 46, 621-630.
Lagodimos, A. G., & Leopoulos, V. (2000). Greedy heuristic algorithms for manpower shift planning. International Journal of Production Economics, 68(1), 95-106.
Lagodimos, A. G., & Paravantis, J. A. (2006). Improved heuristic for manpower shift planning with modified shift priorities. Production Planning & Control, 17(3), 301-310.
Mattia, S., Rossi, F., Servilio, M., & Smriglio, S. (2017). “Staffing and scheduling flexible call centers by two-stage robust optimization.” Omega, 72, 25-37.
McEwan Young, W. (1978). “Flexible working arrangements in continuous shift production.” Personnel Review, 7(3), 12-19.
Morris, J., & Blyton, P. (Eds.). (1991). A Flexible Future?: Prospects for Employment and Organization. Gruyter, Walter de, & Company.
Northrup, H. R., Wilson, J. T., & Rose, K. M. (1979). “The twelve-hour shift in the petroleum and chemical industries.” ILR Review, 32(3), 312-326.
Pace, D. K. (2003). Verification, validation, and accreditation of simulation models. In Applied system simulation (pp. 487-506). Springer, Boston, MA.
Poole, M., & Warner, M. (Eds.). (1998). The IEBM handbook of human resource management. London: International Thomson Business Press.
Rong, A., & Grunow, M. (2009). “Shift designs for freight handling personnel at air cargo terminals.” Transportation Research Part E: Logistics and Transportation Review, 45(5), 725-739.
Seçkiner, S. U., Gökçen, H., & Kurt, M. (2007). “An integer programming model for hierarchical workforce scheduling problem.” European Journal of Operational Research, 183(2), 694-699.
Stevenson, W. J., Hojati, M., & Cao, J. (2007). Operations management. McMcGraw-Hill Irwin.
Stolletz, R., & Brunner, J. O. (2012). “Fair optimization of fortnightly physician schedules with flexible shifts.” European Journal of Operational Research, 219(3), 622-629.
Thompson, G. M. (1990). “Shift scheduling in services when employees have limited availability: An LP approach.” Journal of Operations Management, 9(3), 352-370.
Turniansky, B., & Hare, A. P. (1998). Individuals and groups in organizations. Sage.
Van den Bergh, J., Beliën, J., De Bruecker, P., Demeulemeester, E., & De Boeck, L. (2013). “Personnel scheduling: A literature review.” European journal of operational research, 226(3), 367-385.
Volland, J., Fügener, A., & Brunner, J. O. (2017). “A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals.” European Journal of Operational Research, 260(1), 316-334.
全國法規資料庫_勞動基準法:https://law.moj.gov.tw/LawClass/LawAll.aspx?PCode=N0030001
全國法規資料庫_職業安全衛生法:https://law.moj.gov.tw/LawClass/LawAll.aspx?pcode=N0060001