1.Bright Aforla, Anthony Woode, David Kwame Amoah,2016, Causes of delays in highway construction projects in Ghana, Civ, Environ, Vol 8, No 11.
2.Artan Ilter G, Bakioglu D, 2018, Modeling the relationship between risk and dispute in subcontractor contracts, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Volume 10 Issue 1 .
3.Ashurst, 2021, COVID-19: Impact on the construction sector, https://reurl.cc/kqzeVr.
4.Assaad Rayan, Islam H. El-adaway,2022, The COVID-19 Pandemic: A Catalyst and Accelerator for Offsite Construction Technologies, ASCE.J.Manage.Eng. P 386
5.Assaad Rayan, Abdul Malak, 2020, Legal perspective on treatment of delay liquidated damages and penalty clauses by different jurisdictions: Comparative analysis, ASCE.J.Leg. Aff. Dispute Resolut. Eng.Constr, P122.
6.Assaad Rayan, Islam H. El-adaway, 2021, Guidelines for responding to COVID-19 pandemic: Best practices, impacts, and future research directions,ASCE. J. Manage. Eng, P 373.
7.BCA, 2020, Gradual resumption of construction work, https://reurl,cc/mZKnY1.
8.Cecep Kamiludin, Andreas Roy, 2022, Identifying The Impact Of The COVID-19 Pandemic On The Indonesian Construction Sector Using The Exploratory Factor Analysis EFA, Universitas Kadiri Riset Teknik Sipil, Volume 06 Number 01.
9.Nashwan Dawood, 1998, Estimating project and activity duration: a risk management approach using network analysis, Construction Management and Economics, P41-48.
10.Hossein Karimi, Timothy R. B. Taylor, 2018, Impact of skilled labor availability on construction project cost performance,ASCE.J.Construct. Eng.Manag, Volume 144 Issue 7.
11.International Labour Organization ILO, 2022, https://www,ilo,org/global/lang--en/index,htm.
12.Youjin Jang,Inbae Jeong,Yong K. Cho,2020, Business failure prediction of construction contractors using a LSTM RNN with accounting construction market, and macroeconomic variables, ASCE.J.Manage.Eng, P362.
13.Jelena M, Andric Wang Jiayuan, 2019, Identifying the Critical Risks in Railway Projects Based on Fuzzy and Sensitivity Analysis: A Case Study of Belt and Road Projects, MDPI ,Sustainability Journals,Volume 11 Issue 5 .
14.Kim Sungchul, Kong Minjin, Choi Jinwoo, Han Seungwoo, 2021, Feasibility Analysis of COVID-19 Response Guidelines at Feasibility Analysis of COVID-19 Response Guidelines at Terms of Cost and Time, ASCE.J.Manage. Eng. P375.
15.Aurelia Yew Yun Rong, 2022, Impact of COVID-19 Pandemic on Demand, Output, and Outcomes of Construction projects in Singapore, J, Manage, Eng.
16.Lizi Luo, Xin Jin, Geoffrey Qiping Shen, Yingjie Wang , 2020, Supply chain management for prefabricated building projects in Hong Kong, ASCE.J.Manage. Eng, P362.
17.Madhumitha T S, Shankar C, 2020, Analysing and managing bridge construction projects in india, International Research Journal of Engineering and Technology IRJET, Volume 07 Issue 08.
18.McKinsey, 2020, Getting to the next normal, New York: Mckinsey, https://reurl.cc/EX575n.
19.N Gürsakal,B Batmaz, G Aktuna, 2020, Drawing transmission graphs for COVID-19 in the perspective of network science, Epidemiology and Infection, Nov 4.
20.A.S. Ojo, D.R. Ogunsemi, 2010, Assessment of contractors understanding of risk management in Seychelles constructionindustry, Proceeding of the RICS COBRA Research,p373-380.
21.Padhye Jeon, Suyash Jung Ho, 2022, Impact of COVID-19 on the US Construction Industry as Revealed in the Purdue Index for Construction, ASCE.J. Manage.Eng. Volume 38, P3565.
22.C. Ramanathan,Narayanan Sambu Potty,Arazi Bin Idrus, 2011, Risk factors influencing time and cost overrun in multiple D&B projects in Malaysia: A case study, International Conference on Industrial Engineering and Engineering Management,p854-859.
23.Rezaie Kamran, 2013, Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties, Applied Mathematics and Computation, Volume 190 Issue 2.
24.Rouleau L, Gosselin J, 2021, Impacts of the COVID-19 lockdown on energy consumption in a Canadian social housing building, Appl.Energy, P 287 .
25.Sam Anak Gara,Rozana Zakaria,Eeydzah Aminudin,Khairulzan Yahya,Abdul Rahman MohdJawa, 2022, Effects of the COVID-19 Pandemic on Construction Work Progress: An On-Site Analysis from the Sarawak Construction Project, Malaysia, Sustainability, P14.
26.Grant Suneson,2020, Industries hit hardest by coronavirus in the US include retail, transportation, and travel, USA Today,https://reurl.cc/oZaEVq .
27.Wang Zhimin, Zixiao Liu, 2021, Risk Identification and Responses of Tunnel Construction, Advances in Civil Engineering, Article ID 6661099.
28.市政府都市發展局,2021,重要政策-紓困振興措施(1.0-3.0)成果,https://reurl.cc/pZeyax。
29.中華民國內政部營建署,2021,營造業經濟概況調查,https://reurl.cc/NGK6Ye。
30.行政院公共工程委員會,2020,COVID-19疫情對公共建設之影響與因應對策,中國土木水利期刊,47卷1期pp. 3-6。
31.宋文娟,2006,專案管理,新加坡商亞洲湯姆生國際出版有限公司。
32.李佳龍、盧宗憲,2020,疫情疫情營建物價影響乎?,中國土木水利期刊,47卷1期pp. 15-19。
33.李強、張靜、張耀坦,2007,蒙地卡羅模擬技術在工程進度計劃中的應用,長江大學學報。
34.辛炳隆,2021,論疫情下臺灣勞動市場現況與因應,台灣勞工季刊,NO. 63。
35.施義芳、林曜滄、劉念平、吳文隆、周昌典、邱水碧、吳淑惠,2020,新冠肺炎疫情對工程產業之衝擊與因應探討,中國土木水利期刊,47卷1期pp. 7-14。
36.原振圖,2007,高架捷運工程施工風險探討,國立高雄第一科技大學,碩士論文。37.陳穎芃,2022,國際產業缺工缺料拖累美建屋進度延誤.,時報資訊,https://reurl.cc/zrnzM7。
38.彭武鵬,2020,談疫情及缺工對營造廠商之影響,台北市土木技師公會-技師電子報,770 期,https://www.tpce.org.tw/data/data1/776-1.pdf。
39.彭金玉. 2009,企業風險管理的指引–ISO 31000風險管理系統,環境與管理研究,10卷1期。
40.楊智斌、尹碧娟、魏沛銳、歐昇芬、高志魁、江筱雯,2005,公共工程時程延遲原因與計算方法分析,行政院國家科學委員會專題研究計畫成果報告。
41.遠劉智,2005,公共工程進度計算方式之認定研究,國立中央大學,碩士論文。
42.劉泰儀、周南山、陳柏翰,2020,新型冠狀病毒(COVID-19)對台灣營造產業影響之初探,中國土木水利期刊,47卷1期pp. 20-25。
43.鄭伊君,2009,國內法院時程延遲判例中使用分析技術與延遲原因之分析,中華大學,碩士論文。44.盧振宇,2009,運用動態貝氏網路架構營建專案成本超支預測系統之研究,國立臺灣科技大學,碩士論文。45.謝耀賢,2008,工程專案風險管理系統分析與規劃–以高速鐵路工程為例,國立高雄應用科技大學,碩士論文。