1.中國BIM培訓網,BIM概念介紹,111.05.15,取自https://kknews.cc/design/9j5q9ab.html
2.SPATIAL,BIM建築生命週期介紹,111.05.15,取自 https://www.spatial.com/zh/industries/
3.STRUCYURESINSIDER,BIM維度應用介紹,111.05.15,取自https://www.structuresinsider.com/post/dimensions-of-bim-explained
4.VERACITY,BIM特點介紹,111.05.15,取自https://veracityconsultant.com.tw/what-is-bim/
5.歐亞電腦股份有限公司,Tekla Structures,111.07.20,取自 http://www.ecsap.com/index.php?option=com_content&view=article&id=19&Itemid=5
6.龍庭資訊有限公司,Graphisoft ArchiCAD,111.07.20,取自http://www.academicd.com/domnload/Graphisoft.pdf
7.Bentley System,Bentley Architecture,111.07.20,取自https://pdf.archiexpo.com/pdf/bentley-systems/bentley-architecture/1845-11781.html
8.大塚資訊科技股份有限公司,Autodesk Revit,111.07.20,取自https://www.oitc.com.tw/products-detail/Revit/33
9.吳佳玲,2021,自動化BIM施工圖建置程式之研究-以機電施工圖為例,國立高雄科技大學土木工程與防災科技研究所,碩士論文。10.陳昭惠、蘇瑞育、盧祥偉,2010,“淺談 BIM 於營建工程分階段之實務推動與應用”,土木水利,第 37 卷,第 5 期,頁25~30,7月。
11.葉子寧,2012,BIM在工程備標階段實務應用模式之研究,國立臺北科技大學土木與防災研究所,碩士論文。12.林純民,2005,營造廠商備標作業之探討,國立高雄第一科技大學營建工程所,碩士論文。13.Ben F. Bigelow,Somik Ghosh,2021, “Does Using BIM Application to Automate QuantitySurveying Increase Bidding Success”,EPiC Series in Built Environment, Vol.2, pp.146-155.
14.Li wei,2017, “Application of BIM technology in construction bidding”, IGRED Earth and Environmental Science,Vol.100, Issue 1, pp. 012178.
15.Qingjuana Liu,Jialin Cao,2021, “Application Research on Engineering Cost Management Based on BIM”,Procedia Computer Science, Vol.183, pp.720-723.
16.詹昊,2015,建築資訊模型(BIM)於工程進度、成本估算之實務應用,國立高雄應用科技大學土木工程與防災科技研究所,碩士論文。17.Sudersan Ambalam Vassen, 2021, “Impact of BIM-based Quantity Take off for Accuracy of Cost Estimation,Lead Project Manager” ,International Journal of Construction Engineering and Management, Vol.10, No.3,pp.55-69.
18.Becvarovska R.,Matejka P.,2014, “Comparative analysis of creating traditional quantity takeoff method and using a BIM tool”,Construction MaeconomicsConference, pp.1-4.
19.Taihairan R.B.R. ,Ismail Z.,2015, “BIM: Integrating cost estimates at initial/design stage”,International Journal of Sustainable Construction Engineering and Technology,Vol.6, No.1, pp.62-74.
20.Olsen D.,Taylor J.M.,2017, “Quantity take-off using building information modeling (BIM) and its limiting factors”,Procedia Engineering,Vol.196, pp.1098-1105.
21.Firat C.E.,Arditi D.,Hämäläinen J.P.,Stenstrand J.,Kiiras J.,2010, “Quantity take-off in model-based systems”, Computer Science.
22.Eroglu E.,2019,Evaluation of the reliability of BIM-based quantity take-off processes in construction projects,Middle East Technical University,Thesis.
23.Ma Z.,Liu Z.,2014, “BIM-based intelligent acquisition of construction information for cost estimation of building projects”, Procedia Engineering,Vol.85, pp.358-367.
24.Choi J.,Kim H.,Kim I.,2015, “Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage” ,Journal of Computational Design and Engineering, Vol.2, No.1, pp.16-25.
25.Fung W.P. ,Salleh H.,Rahim,F.A.M.,2014, “Capability of building information modeling application in quantity surveying practice”, Journal of Surveying,Construction and Property,Vol.5,No.1, pp.1-13.
26.Eroglu E.,2019,Evaluation of the reliability of BIM-based quantity take-off processes in construction projects,Middle East Technical University,Thesis.
27.Masood R.,Kharal M.,Nasir A.,2014, “Is BIM Adoption Advantageous for Construction Industry of Pakistan”, Procedia Engineering,Vol.77,pp.229-238.
28.楊惠琪、張昇、吳翌禎,2022,“BIM應用於工程標案成本議價空間之探討”,2022工程永續與土木防災研討會,6月。