|
一、 中文文獻
盟立自動化股份有限公司(2019 年 12 月 10 日)。半導體級 AGV(無人搬運車)及周邊自動搬送系統整合應用。取自:https://is.gd/gMbdtL,擷取:西元 2020 年 1 月 2 日。
二、 英文文獻 Ümit Bilge & J.MA Tanchoco, 1997 , “AGV systems with multi-load carriers: Basic issues and potential benefits”, Journal of Manufacturing Systems,Vol. 16(3),Pages 159-174.
Gerard Cachon & Christian Terwiesch., 2011, “Matching Supply with Demand: An Introduction to Operations Management 3rd”, McGraw-Hill Education .
Marcel Flipse, 2011, “ Altering and improving kiva some suggestions for improvement of the current kiva system ”, Netherlands :Vrije Universiteit, Artificial Intelligence Department.
Hamed Fazlollahtabar & Mohammad Saidi-Mehrabad, 2015, “ Methodologies to Optimize Automated Guided Vehicle Scheduling and Routing Problems: A Review Study ”, Journal of Intelligent & Robotic Systems, Vol. 77, Pages 525-545 .
Robert J. Gaskins., J. M. A. Tanchoco , & Fataneh Taghoboni, , 1989, “ Virtual flow paths for free-ranging automated guided vehicle system ” International Journal of Production Research, Vol. 27(1), Pages 91-100.
Wei He , Zhijun Li ,& C. L. Philip Chen , 2017, “ A survey of human-centered intelligent robots: issues and challenges ”, IEEE/CAA Journal of Automatica Sinica,Vol. 4(4) , Pages 602-609.
Byung Ho Jeong & Sabah U. Randhawa, 2001, “ A multi-attribute dispatching rule for automated guided vehicle systems ”, International Journal of Production Research, Vol.39(13), Pages 2817-2832 .
John D. C. Little ,1961, "A Proof for the Queuing Formula: L =λW". Operations Research, Vol. 9 (3) , Pages 383–387.
James T. Lin, Fu-Kwun Wang, & C. K. Wu, 2003, “ Connecting transport AMHS in a wafer fab ”, International Journal of Production Research, Vol. 41(3), Pages 529-544 .
Tuan Le-Anh & M.B.M.De Koster, 2006, “ A review of design and control of automated guided vehicle systems”, European Journal of Operational Research,Vol. 171(1), Pages 1-23.
Moulaye Aidara Ndiaye , Stéphane Dauzère-Pérès , Claude Yugma , Lionel Rullière ,& Gilles Lamiable, 2016, “ Automated transportation of auxiliary resources in a semiconductor manufacturing facility”, 2016 Winter Simulation Conference (WSC) .
Ronald L. Webster & David F. Foster, 1990, “ Building flexible AGV and ASRS system models for facility design phase applications ”, the 22nd conference on Winter simulation, Pages 692-698
F.K.Wang & J.T.Lin, 2004, “ Performance evaluation of an automated material handling system for a wafer fab ”, Robotics and Computer-Integrated Manufacturing, Vol. 20(2),Pages 91-100 .
|