|
[1]Abdulaziz M. Jarkas,Saleh A. Mubarak,Charles Y. Kadri, 2014. Critical Factors Determining Bid/No Bid Decisions of Contractors in Qatar. American Society of Civil Engineers Journal of Management in Engineering, 30(4). [2]Abdulrahman Salem Bageis and Chris Fortune, 2009. Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1). [3]Agnieszka Leśniak and Edyta Plebankiewicz, 2014. Modeling the decision-making process concerning participation in construction bidding. Journal of Management in Engineering, 31(2). [4]Agnieszka Leśniak, Daniel Kubek、Edyta Plebankiewicz, Krzysztof Zima and Stanisław Belniak, 2018. Fuzzy AHP application for supporting contractors' bidding decision. Symmetry, 10(11). [5]Ahmed H. Ibrahim and Lamiaa M. Elshwadfy, 2021. Factors Affecting the Accuracy of Construction Project Cost Estimation in Egypt. Jordan Journal of Civil Engineering, 15(3). [6]Ahsen Maqsoom ,Hassan Ashraf, Rafiq Muhammad Choudhry,Sufian Younas Khan,Muhammad Dawood and Adeel Tariq, 2020. Extrinsic factors influencing the bid / no-bid decision of construction contracting firms Impact of firm size and experience. Revista de la Construcción, 19(1). [7]B. Postlethwaite, 1990. Basic theory and algorithms for fuzzy sets and logic. lEE Control Engineering Series, Vol. 44 , pp. 34-46. [8]Ching-Torng Lin and Ying-Te Chen, 2004. Bid /no-bid decision-making—A fuzzy linguistic approach. International Journal of Project Management, 22(7), pp. 585-593. [9]D. K. H. Chua and D. Li, 2000. Key factors in bid reasoning model. Journal of Construction Engineering and Management, 126(5). [10]David J. Lowe and Jamshid Parvar, 2004. A logistic regression approach to modelling the contractor’s decision to bid. Construction Management and Economics, 22(6), pp. 643-653. [11]Duygu Kalan and Mehmet Egemen Ozbek, 2019. Development of a Construction Project Bidding Decision-Making Tool. Practice Periodical on Structural Design and Construction, 25(1). [12]Edyta Plebankiewicz amd Daniel Kubek, 2015. Multicriteria Selection of the Building Material Supplier Using AHP and Fuzzy AHP. Journal of Construction Engineering and Management, 142(1). [13]Edyta Plebankiewicz, 2014. Modelling decision-making processes in bidding procedures with the use of the fuzzy sets theory. International Journal Of Strategic Property Management, Issue 3, pp. 307-316. [14]Guanghua Li, Chuan Chen and Jing Dai, 2019. The Relationships of the Bid/No Bid Decision Factors Considered Among Local Contactors from Different Countries. International Symposium on Advancement of Construction Management and Real Estate, pp. 1047-1061. [15]Guanghua Li, Chuan Chen, Guomin Zhang, Igor Martek, 2019. Bid/no-bid decision factors for Chinese international contractors in international construction projects. Engineering Construction & Architectural Management, 27(7). [16]Guanghua Li, Chuan Chen, Igor Martek, Yibin Ao and Jing Dai, 2021. Bid or No-Bid Decision Model for International Construction Projects Evidential Reasoning Approach. Journal of Construction Engineering and Management, 147(2). [17]Guanghua Li,Guomin Zhang , Chuan Chen and Igor Martek, 2020. Empirical Bid or No Bid Decision Process in International Construction Projects Structural Equation Modeling Framework. Journal of Construction Engineering and Management, 146(6). [18]Ibrahim Mahamid, 2018. Critical Determinants of Public Construction Tendering Costs. International Journal of Architecture, Engineering and Construction, 7(1). [19]Jin-Sub Hwang and Yea-Sang Kim, 2015. A bid decision-making model in the initial bidding phase for overseas construction projects. Korean Society of Civil Engineers, 0(0). [20]Jinxiu Wang, Lin Wang, Kunhui Ye, Yongwei Shan, 2020. Will Bid/No-Bid Decision Factors for Construction Projects Be Different in Economic Downturns? A Chinese Study. Applied Sciences, 10(5). [21]Kunhui Ye,Bingheng Li and Liyin Shen, 2013. Key Factors Considered in Compiling Tender Prices for China’s Public Works Projects. Journal Of Management In Engineering, 29(3). [22]L.A.Zadeh, 1965. Fuzzy sets. Information and Control, 6, 8(3), pp. 338-353. [23]Likert, Rensis, 1932. A Technique for the Measurement of Attitudes. Archives of Psychology. [24]Maxwell L. Chisala, 2017. Quantitative Bid or No-Bid Decision-Support Model for Contractors. Journal of Construction Engineering and Management, 143(12). [25]Mohammad S. El-Mashaleh, 2010. Decision to bid or not to bid a data envelopment analysis approach. Canadian Journal of Civil Engineering, 37(1). [26]Mohammad S. El-Mashaleh, 2013. Empirical Framework for Making the Bid/No-Bid Decision. Journal of Management in Engineering, 29(3). [27]Mohammed Fadhil Dulaimi and Hong Guo Shan, 2002. The factors influencing bid markup decisions of large and medium sized contractors in Singapore. Construction Management and Economics, 20(7). [28]Mohammed Marzouk and Emad Mohamed, 2017. Modeling bid/no-bid decisions using fuzzy fault tree. Construction Innovation, 18(1). [29]Morteza Shokri-Ghasabeh , Nicholas Chileshe, 2015. Critical factors influencing the bid/no-bid decision in the Australian construction industry. Construction Innovation, 16(2). [30]Nabi Ibadov, 2015. Contractor Selection for Construction Project, with the Use of Fuzzy Preference Relation. Procedia Engineering, Vol. 111, pp. 371-323. [31]Nicholas Chileshe, Neema Kavishe and David John Edwards, 2020. Critical factors influencing the bid or no-bid decision of the indigenous small building contractors in Tanzania. Construction Innovation, 21(2). [32]Nunnally, J.C., 1978. Psychometric Theory (2nd ed.). New York [33]Oluwole Alfred Olatunji, Olaniyi Isaac Aje and Sina Makanjuola, 2016. Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(3). [34]R. Jager, H.B. Verbruggen & P.M. Bruijn, 1992. The Role of Defuzzification Methods in the Application of Fuzzy Control. IFAC Proceedings Volumes, 25(6), pp. 75-80. [35]Rifat SONMEZ and Burak SÖZGEN, 2016. A support vector machine method for bid/no-bid decision making. Journal Of Civil Engineering And Management, 23(5). [36]Ståhle, L. & Wold, S., 1989. Analysis of variance (ANOVA). Chemometrics and Intelligent Laboratory Systems, 6(4), pp. 259-272. [37]T.M.S. Elhag, A.H. Boussabaine and T.M.A. Ballal, 2005. Critical determinants of construction tendering costs:Quantity surveyors' standpoint. International Journal of Project Management, 23(7). [38]Werner Van Leekwijck, Etienne E. Kerre, 1999. Defuzzi. Fuzzy Sets and Systems, Vol. 108 , pp. 159-178. [39]YeEun Jang, J. S. a. J.-S. Y., 2021. Classifying the Level of Bid Price Volatility Based on Machine Learning with Parameters from Bid Documents as Risk Factors. Sustainability, 13(7). [40]Yong Qiang Chen ,Su Juan Zhang, Li Sha Liu and Jia Hu, 2015. Risk perception and propensity in bid/no-bid decision-making of construction projects. Engineering, Construction and Architectural Management, 22(1). [41]內政部營建署主計室, 2022. 109年營造業經濟概況調查報告, 臺北市: 內政部營建署. [42]王正華、陳寬裕, 2021. 論文統計分析實務:SPSS與AMOS的運用(第四版). 臺北市: 五南圖書. [43]行政院公共工程委員會, 2021. 工程會歸納流標主因 要求機關務實檢討. https://reurl.cc/de3jAM [44]行政院公共工程委員會, 2022. 因應大環境缺工、缺料情形 政府已設法解決並發揮功效. https://reurl.cc/10V7OW [45]行政院公共工程委員會, 2022. 協調解決缺工問題 已顯成效. https://reurl.cc/eW27Vj [46]行政院主計總處綜合統計處, 2006. 營造工程物價指數統計資料背景說明, 臺北市: 行政院主計總處. [47]行政院主計總處綜合統計處, 2017. 105年基期物價指數修訂說明, 臺北市: 行政院主計總處. [48]林志憲、陳耀光, 2018. 經濟變量與效用函數聯合決策之投標策略評估. 中華民國建築學會建築學報, 第105期, pp. 51-70. [49]林進南, 2021. 2022年我國營造業分析. 台灣經濟研究院產經資料庫. [50]姚乃嘉、楊智斌、郭文達, 2001. 投標決策因素之分析與應用. 中華民國建築學會建築學報, 第36期, pp. 21-37. [51]蕭文龍, 2020. 統計分析入門與應用:SPSS中文版+SmartPLS 3(PLS-SEM)(第三版). 臺北市: 碁峰資訊. [52]蘇宇暉、羅凱揚、趙雪君, 2019. 李克特量表(Likert Scale)的起源和使用. [https://reurl.cc/AyNQ4Y
|