1.Akjiratikarl, C., P. Yenradee, and P. R. Drake, “PSO-based algorithm for home care worker scheduling in the UK,” Computers & Industrial Engineering, Vol.53, pp.559-583, 2007.
2.Biswas, S. and Mahapatra, S. S., “Modified particle swarm optimization for solving machine-loading problems in flexible manufacturing system,” International Journal of Advanced Manufacturing Technologies, 2007.
3.Bonneville, F., Perrard, C. and Henrioud, J. M., “A genetic algorithm to generate and evaluate assembly plans,” Proceedings of the IEEE Symposium on Emerging Technology and Factory Automation, pp.231-239, 1995.
4.Cao, P. B. and Xiao, R. B., “Assembly planning using a novel immune approach,” International Journal of Advanced Manufacturing Technologies, Vol.31, pp.770-782, 2007.
5.Chen, S. F. and Liu, Y. J., “An adaptive genetic assembly-sequence lanner,” International Journal of Computer Integrated Manufacturing, 14(5), pp.489-500, 2001.
6.Chen, Ruey-Shun, Kun-Yung Lu and Pei-Hao Tai, “Optimizing assembly planning through a three-stage integrated approach,” International Journal of Production Economics, Vol. 88, No. 3, pp.243-256, 2004.
7.Cheng, R., M. Gen, and T. Tozawz, “Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithms,” Computer & Industrial Engineering, Vol. 29, pp. 513-517, 1995.
8.Choi, C. K., Zha, X. F., NG, T. L. and Lau, W. S., “On the automatic generation of product assembly sequences,” International Journal of Production Research, Vol. 36, No. 3, pp.617-633, 1998.
9.Heiko Mosemann and Friedrich M. Wahl, “Automatic Decomposition of Planned Assembly Sequences Into Skill Primitives,” IEEE Transactions on Robotics and Automation, Vol. 17, No.5, pp.709-718, 2001.
10.Ho, W. and Ji, P., “Component scheduling for chip shooter machines: a hybrid genetic algorithm approach,” Computers and Operations Research, Vol.30, pp.2175-2189, 2003.
11.Ho, W. and Ji, P., “A hybrid genetic algorithm for component sequencing and feeder arrangement,” Journal of Intelligent Manufacturing, Vol.15, pp.307-315, 2004.
12.Ho, W. and Ji, P., “A genetic algorithm to optimise the component placement process in PCB assembly,” International Journal of Advanced Manufacturing Technologies, Vol.26, pp.1397-1401, 2005.
13.Ho, W. and Ji, P., “A genetic algorithm approach to optimizing component placement and retrieval sequence for chip shooter machins,” International Journal of Advanced Manufacturing Technologies, Vol.28, pp.556-560, 2006.
14.Holland, J. H., “Adaptation in natural and artificial systems: an introductory analysis with applications to biology, control, and artificial intelligence,” University of Michigan Press, 1975.
15.Kennedy, J., and R. Eberhart, “Particle Swarm Optimization,” Proceedings of IEEE International Conference on Neural Networks, pp.1942-1948, 1995.
16.Kulak, O.,I. O. Yilmaz and H. –O. Günther, “PCB assembly scheduling for collect-and-place machines using genetic algorithms,” International Journal of Production Research, Vol. 45, No. 17, pp.3949-3969, 2007.
17.Lapperriere`, L., and ElMaraghy, H. A., “GAPP:a generative assembly process planner,” Journal of Manufacturing Systems, Vol. 15, No. 4, pp.282-293, 1996.
18.Lian, Z., Gu, X. and Jiao, B., “A similar particle swarm optimization algorithm for permutation flowshop scheduling to minimize makespan,” Applied Mathematics and Computation, 175, pp.773-785, 2006.
19.Marain, R. M., Luong, L. H. S. and Abhary, K., “A genetic algorithm for the optimization of assembly sequences,” Computer and Industrial Engineering, Vol.50, pp.503-527, 2006.
20.Rahimi-Vahed, A. R. and Mirghorbani, “A multi-objective particle swarm for a flow shop scheduling problem,” Journal of Combinatorial Optimization, 13(1), pp. 79-102, 2007.
21.Senin, N.,Goppetti, R. and Wallace, D. R., “Concurrent assembly planning with genetic algorithms,” Robotics and Computer Integrated Management, 16(4), pp.65-72, 2002.
22.Smith, G. C. and Smith, S. F., “An enhanced genetic algorithm for automated assembly planning,” Robotics and Computer Integrated Management, 18, pp.355-364, 2002.
23.Su, Q., “Applying case-based reasoning in assembly sequence planning,” International Journal of Production Research, Vol.45, No.1, pp.29-47, 2007.
24.Tseng, H. E., Li, J. D. and Chang Y. H., “Connector-based approach to assembly sequences with genetic algorithms,” International Journal of Production Research, Vol.42, No.1, pp.2243-2261, 2004.
25.Tseng, H. E., “Guided genetic algorithms for solving a larger constraint assembly problem,” International Journal of Production Research, Vol. 44, No.3, pp.601-625, 2006.
26.Wang, J. F., Liu, J.H. and Zhong, Y. F., “A novel ant colony algorithm for assemble sequence planning,” International Journal of Advanced Manufacturing Technologies, 25, pp.1137-1143, 2005.
27.江吉祥,「以STEP為基進行產品組裝與拆卸分析之推演架構」,國立台灣科技大學機械工程系,碩士論文,2000。28.江俊霖,「電子產品組裝廠之跨廠組裝次序」,元智大學工業工程與管理研究所,碩士論文,2002。29.林吉宏,「組裝次序與加工次序之整合規劃研究-應用基因演算法」,元智大學工業工程與管理研究所,碩士論文,2000。30.施欣怡,「改良式基因演算法求解複雜限制式之組裝規劃問題探討」,大葉大學工業工程與管理系,碩士論文,2005
31.徐誠佑,「粒子群演算法於離散最佳化問題之研究」,國立交通大學工業工程與管理研究所,博士論文,2007。32.張銀和,「引導式基因演算法應用於Connector為基之組裝規劃」,大葉大學工業工程與管理系,碩士論文,2004。33.曾懷恩、張堂聖、湯承恩,「組裝規劃中以模擬退火法產生組裝順序的探索」,Journal of the Chinese Institute of Industrial Engineers, Vol. 20, No. 2, pp.91-100, 2003。
34.蔡佳利,「跨廠組裝與加工次序整合規劃研究」,元智大學工業工程與管理研究所,碩士論文,2003。35.黎長明,「改良式突變型態之粒子群演算法於客服人員排班的應用」,元智大學資訊管理學系,碩士論文,2007。36.鍾清章等譯,田口式品質工程導論,中華民國品質學會,台北,民國九十四年。