參考文獻
[1]Abdul-Jalbar, B., Gutiérrez, J.M., Sicilia, J. An integrated inventory model for the single-vendor two-buyer problem. (2007) International Journal of Production Economics, 108 (1-2), 246-258.
[2]Abdul-Jalbar, B., Gutiérrez, J.M., Sicilia, J. Policies for a single-vendor multi-buyer system with finite production rate (2008) Decision Support Systems, 46 (1), 84-100.
[3]Beatriz Abdul-Jalbar, Jose’ M. Gutie’ rrez, Joaquı’n Sicilia. (2007) An integrated inventory model for the single-vendor two-buyer problem.Int. J. Production Economics, 108, 246–258.
[4]Bhaba, R. Sarker, Gyana R. Parija, “Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system”, European Journal of Operational Research, 89, 593-608 (1996).
[5]Buscher U, Lindner G. Optimizing a production system with rework and equal sized batch shipments. (2007) Computers & Operations Research, 34, 515-535.
[6]Chan, C.K., Cheung, B.K.-S., Langevin, A. Solving the multi-buyer joint replenishment problem with a modified genetic algorithm. (2003) Transportation Research Part B: Methodological, 37 (3), 291-299.
[7]Chen, J.-M., Chen, T.-H. The profit-maximization model for a multi-item distribution channel. (2007) Transportation Research Part E: Logistics and Transportation Review, 43 (4), 338-354.
[8]Chiu, Singa Wang, “Determining the optimal lot size for the finite production model with an imperfect rework process of defective items”, Journal of Information & Optimization Sciences, Vol. 25, No. 1, pp. 105-119 (2004).
[9]Chiu, S.W. & Chiu, Y.P. (2005). The finite production model with the reworking of defective items. International Journal of Industrial Engineering, 12(1),15-20.
[10]Chiu, Y.P. and Chiu, S.W., “An economic production quantity model with the rework process of repairable defective items”, Journal of information & optimization sciences, Vol. 24, No. 3, pp.569-582 (2003).
[11]Chu, C.-L., Leon, V.J. Single-vendor multi-buyer inventory coordination under private information. (2008) European Journal of Operational Research, 191 (2), pp. 484-502.
[12]Darwish, M.A., Odah, O.M. (2010). Vendor managed inventory model for single-vendor multi-retailer supply chains. European Journal of Operational Research, 204 (3), pp. 473-484.
[13]Diponegoro, Ahmad, Sarker, Bhaba R., “Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries”, Computers & Operations Research, 33, 2387–2404 (2006).
[14]Goyal, S.K., Huang, C.K. & Chen, K.C. (2003). A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning and Control, 14 (7), 596-602.
[15]Harris Ford W. (1913). “How many parts to make at once? ”, The Magazines of Management, 10, 135-152.
[16]Hayek, P.A. & Salameh, M.K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, 12( 6) ,584-590.
[17]Hoque, M.A. & Goyal, S.K. (2000). An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment. International Journal of Production Economics, 65(3), 305-315.
[18]Inderfurth, K., Janiak, A., Kovalyov, M.Y. & Werner, F. (2006). Batching work and rework processes with limited deterioration of reworkables. Computers and Operations Research,33(6), 1595-1605.
[19]Inderfurth, K., Kovalyov, M.Y., Ng, C.T. & Werner, F. (2007). Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. International Journal of Production Economics, 105 (2), 345-356.
[20]Jamal, A.M.M., Sarker, B.R. & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering, 47 (1), 77-89.
[21]Kanyalkar, A.P., Adil, G.K., 2009. Determining the optimum safety stock under rolling schedules for capacitated multi-item production systems.International Journal of Services and Operations Management, 5 (4), 498-519.
[22]Kim, T., Hong, Y., Chang, S.Y. Joint economic procurement-production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system. (2006) International Journal of Production Economics, 103 (1), 199-208.
[23]Khouja, M. Optimizing inventory decisions in a multi-stage multi-customer supply chain (2003) Transportation Research Part E: Logistics and Transportation Review, 39 (3), pp. 193-208.
[24]Kohli, R., Park, H. Coordinating buyer-seller transactions across multiple products(1994) Management Science, 40 (9), pp. 45-50.
[25]Lu Lu, “A one-vendor multi-buyer integrated inventory model”, European Journal of Operational Research, 81, 312-323(1995).
[26]Mahapatra, N.K.a , Maiti, M.b , 2005. Decision process for multiobjective, multi-item production-inventory system via interactive fuzzy satisficing technique. Computers and Mathematics with Applications, 49 (5-6), 805-821.
[27]Ojha, D., Sarker, B.R., and Biswas, P. An optimal batch size for an imperfect production system with quality assurance and rework. (2007) International Journal of Production Research, 45 (14), 3191-3214.
[28]Parija, G.R. , Sarker, B.R. (1999). Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Transactions(Institute of Industrial Engineers), 31 (11), pp. 1075-1082. Cited 21 times.
[29]Sarker, B.R., Diponegoro, A. Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers (2009) European Journal of Operational Research, 194 (3), pp. 753-773.
[30]Sarker, R.A. & Khan, L.R. (2001). An optimal batch size under a periodic delivery policy. International Journal of Systems Science, 32 (9), 1089-1099.
[31]Sarker, Ruhul A., Khan, Lutfar R., “An optimal batch size for a production system operating under periodic delivery policy”, Computers & Industrial Engineering, 37, 711-730 (1999).
[32]Siajadi, Hans, Ibrahim, Raafat N., Lochert, Paul B., “Joint economic lot size in distribution system with multiple shipment policy”, Int. J. Production Economics, 102, 302–316 (2006).
[33]Taft, E.W. (1918). “The most economical production lot”, The Iron Age,101, 1410-1412.
[34]Teunter, R.H. & Flapper, S.D.P. (2003). Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum, 25 (1), 85-96.
[35]Thomas D.J. and Hackman S.T. A committed delivery strategy with fixed frequency and quantity. (2003) European Journal of Operational Research, 148 (2), 363-373.
[36]Ueno, N.a , Okuhara, K.b , Ishii, H.b , Shibuki, H.c , Kuramoto, T.d, 2007. Multi-item production planning and management system based on unfulfilled order rate in supply chain. Journal of the Operations Research Society of Japan, 50 (3), 201-218.
[37]Woo, Y.Y., Hsu, S.-L., Wu, S. An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction (2001) International Journal of Production Economics, 73 (3), pp. 203-215.
[38]Xie, J.a , Lee, T.S.b , Zhao, X.b, 2004. Impact of forecasting error on the performance of capacitated multi-item production systems. Computers and Industrial Engineering, 46 (2), 205-219.
[39]Yang P.C., Wee H.M. A single-vendor and multiple-buyers production-inventory policy for a deteriorating item. (2002) European Journal of Operational Research, 143 (3), 570-581.
[40]Yao, M.-J., Chiou, C.-C. On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers. (2004) European Journal of Operational Research, 159, 406-419.
[41]王聖嘉,「探討經濟生產批量模式含不良品重工之最佳決策」,博士論文,中原大學工業工程研究所,台中(2003)。[42]李建華,「在供應鏈環境下探討製造商不完美重工生產系統下之(n+1)次送策略與配送至多個購買者的最佳批量與配送次數」,碩士論文,朝陽科技大學工管所,台中(2010) 。[43]林芝安,「在不完美重工生產系統下探討定量多次配送對生產批量與配送次數之最佳決策」,碩士論文,朝陽科技大學工管所,台中(2009)。[44]林怡君,「在含製造商重工程序之供應鏈環境下研究(n+1)次配送策略與配送至多個顧客的最佳生產與配送決策」,碩士論文,朝陽科技大學工管所,台中(2010)。[45]林俐彣,「探討(n+1)次配送及多次配送給多個顧客對不良品部分可重工修復之生產系統的生產批量與配送次數之最佳決策」,碩士論文,朝陽科技大學工管所,台中(2010) 。[46]邱俊霖,「探討非連續配送與不良品可完全重工修復對經濟生產批量決策之影響」,碩士論文,朝陽科技大學工管所,台中(2008)。[47]許志源,「探討多樣產品於同一生產設備上之經濟生產批量」,碩士論文,朝陽科技大學工管所,台中(2003) 。[48]張瀞云,「探討多次定期等量運送對不良品部分可重工修復之生產系統的批量與運送次數之最佳決策」,碩士論文,朝陽科技大學工管所,台中(2009)。[49]劉尚智,「研究定量多次配送與含不良品重工失敗率因素之最佳生產批量決策」,碩士論文,朝陽科技大學工管所,台中(2008)。[50]鍾佳玲,「在不良品可完全重工修復與非連續性配送之生產系統下探討最佳批量與配送次數決策」,碩士論文,朝陽科技大學企管所,台中(2009)。