參考文獻
1.蔡致榮 , 邱相文, 荷蘭與日本植物工廠最新發展.
2.方煒, 話說植物工廠. 農業推廣手冊67輯.
3.方煒, 以植物工廠生產農作物與綠能產業研究發展. 2010.
4.鄔家琪, 現代農園產品—植物工廠的作物. 2013.
5.魏勤韶, 考慮植物生長體積變化之訂單式植物工廠排程演算法, 國立台灣大學碩博士論文. 2015.6.Hung, Y.-F. and C.-Y. Hung, Using Heuristic Search Methods to Solve Resource Constrained Project Scheduling. 2009.
7.Ioslovich, I. and P.-O. Gutman, Optimal control of crop spacing in a plant factory. Automatica, 2000. 36(11): p. 1665-1668.
8.陳世銘, 方煒, 羅筱鳳, 曹幸之, 張耀乾, 廖國基, 顏炳郎, 蔡兆胤, 台灣植物工廠現況與發展策略之分析. 2011.
9.全中和, 天生好野菜--山萵苣. 2009.
10.慶聲科技, 植物工廠大展. 2013.
11.黃怡菁, 山葵植物工廠之研發. 2012.
12.謝博偉, 以排序最佳化模擬為基礎的半導體生產排程法則快速選取方法之設計, 國立台灣大學碩博士論文. 2002.13.吳政翰, DHC 系統之任務指派與排程的新型基因演算法, 國立交通大學碩博士論文. 2006.14.Moreira, M.C.O. and A.M. Costa, Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers. International Journal of Production Economics, 2013. 141(2): p. 552-560.
15.Kantorovich, L., Mathematical methods of organizing and planning production. 1960.
16.Detlefsen, N.K. and A.L. Jensen, Modelling optimal crop sequences using network flows. Agricultural Systems, 2007. 94(2): p. 566-572.
17.Costa, A.M., L.M.R. dos Santos, D.J. Alem, and R.H.S. Santos, Sustainable vegetable crop supply problem with perishable stocks. Annals of Operations Research, 2011. 219: p. 265-283.
18.高德錚, 臺灣發展蔬菜植物工廠之契機. 2010.
19.黃信傑, 植物工廠多作物排程之研究, 國立台灣科技大學碩博士論文. 2012.
20.dos Santos, L.M.R., A.M. Costa, M.N. Arenales, and R.H.S. Santos, Sustainable vegetable crop supply problem. European Journal of Operational Research, 2010. 204(3): p. 639-647.
21.Ferrer, J.-C., A. Mac Cawley, S. Maturana, S. Toloza, and J. Vera, An optimization approach for scheduling wine grape harvest operations. International Journal of Production Economics, 2008. 112(2): p. 985-999.
22.Könnyű, N. and S.F. Tóth, A cutting plane method for solving harvest scheduling models with area restrictions. European Journal of Operational Research, 2013. 228(1): p. 236-248.
23.Range, T.M., R.M. Lusby, and J. Larsen, A column generation approach for solving the patient admission scheduling problem. European Journal of Operational Research, 2014. 235(1): p. 252-264.
24.Alfandari, L., J. Sadki, A. Plateau, and A. Nagih, Hybrid column generation for large-size Covering Integer Programs: Application to transportation planning. Computers & Operations Research, 2013. 40(8): p. 1938-1946.
25.洪崇元, 混合式生產策略下之供應鏈存貨模式, 中原大學碩博士論文. 2003.26.張明毅, 精緻農業-植物工廠的經營. 2012.
27.楊曉芳, 羅信沂LED照出冰花奇蹟. 2013.
28.Kantorovich, L.V., Mathematical methods of organizing and planning production. Management Science, 1960. 6(4): p. 366-422.
29.Biswas, A. and B.B. Pal, Application of fuzzy goal programming technique to land use planning in agricultural system. Omega, 2005. 33(5): p. 391-398.
30.Haneveld, W.K.K. and A.W. Stegeman, Crop succession requirements in agricultural production planning. European Journal of Operational Research, 2005. 166(2): p. 406-429.
31.Bohle, C., S. Maturana, and J. Vera, A robust optimization approach to wine grape harvesting scheduling. European Journal of Operational Research, 2010. 200(1): p. 245-252.
32.Pochet, Y. and F. Warichet, A tighter continuous time formulation for the cyclic scheduling of a mixed plant. Computers & Chemical Engineering, 2008. 32(11): p. 2723-2744.
33.Hartmann, S., A competitive genetic algorithm for resource‐constrained project scheduling. Naval Research Logistics (NRL), 1998. 45(7): p. 733-750.
34.Hu, M.-C., Y.-H. Chen, and L.-C. Huang, A sustainable vegetable supply chain using plant factories in Taiwanese markets: A Nash–Cournot model. International Journal of Production Economics, 2014. 152: p. 49-56.
35.Hari, Y., Multiple-Crop Scheduling for Plant Factory. National Taiwan University of Science and Technology, 2012.
36.Govindakrishnan, P.M., S. Rawat, S.K. Pandey, J.P. Singh, S.S. Lal, and V.K. Dua, Computer Aided Advisory System for Potato Crop Scheduling (Caasps) - a Decision Support Tool for Potato Planting Strategies. International Journal of Agricultural and Statistical Sciences, 2011. 7(2): p. 571-577.
37.Salassi, M.E., M.A. Deliberto, and K.M. Guidry, Economically optimal crop sequences using risk-adjusted network flows: Modeling cotton crop rotations in the southeastern United States. Agricultural Systems, 2013. 118: p. 33-40.
38.Rădulescu, M., C.Z. Rădulescu, and G. Zbăganu, A portfolio theory approach to crop planning under environmental constraints. Annals of Operations Research, 2011. 219(1): p. 243-264.
39.Liao, D.-Y. and Y.-T. Yang, Imaging Order Scheduling of an Earth Observation Satellite. Systems, Man, and Cybernetics, Part C: Applications and Reviews, IEEE Transactions on, 2007. 37(5): p. 794-802.
40.Borodin, V., J. Bourtembourg, F. Hnaien, and N. Labadie, A quality risk management problem: case of annual crop harvest scheduling. International Journal of Production Research, 2014. 52(9): p. 2682-2695.
41.Alfandari, L., J. Lemalade, A. Nagih, and G. Plateau, A MIP flow model for crop-rotation planning in a context of forest sustainable development. 2011.
42.Santos, L.M.R., P. Munari, A.M. Costa, and R.H.S. Santos, A branch-price-and-cut method for the vegetable crop rotation scheduling problem with minimal plot sizes. European Journal of Operational Research, 2015. 245(2): p. 581-590.
43.Alfandari, L., J.L. Lemalade, A. Nagih, and G. Plateau, A MIP flow model for crop-rotation planning in a context of forest sustainable development. Annals of Operations Research, 2009. 190(1): p. 149-164.
44.Gliessman, S.R., Agroecology: Ecological Processes in Sustainable Agriculture. 2000.
45.Tillman, D., K.G. Cassman, P.A. Matson, R. Naylor, and S. Polask, Agricultural sustainability and intensive production practices. 2002.
46.dos Santos, L.M.R., P. Michelon, M.N. Arenales, and R.H.S. Santos, Crop rotation scheduling with adjacency constraints. Annals of Operations Research, 2008. 190(1): p. 165-180.
47.Luh, P.B. and D.J. Hoitomt, Scheduling of Manufacturing Systems Using the Lagrangian Relaxation Technique. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1993.
48.Zhao, X., P.B. Luh, and J. Wang, Surrogate Gradient Algorithm for Lagrangian Relaxation. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1999.
49.盧華安, 因應班機延遲之最佳化即時機門指派, 交通部運輸研究所. 2001.
50.Bragin, M.A., P.B. Luh, J.H. Yan, N. Yu, and G.A. Stern, Convergence of the Surrogate Lagrangian Relaxation Method. Journal of Optimization Theory and Applications, 2014. 164(1): p. 173-201.
51.Fisher, M.L., The Lagrangian Relaxation Method for Solving Integer Programming Problems. Management Science, 2004. 50(12_supplement): p. 1861-1871.
52.郭逸銘, 考量區域涵蓋限制之運輸計劃選擇問題, 國立交通大學碩博士論文. 2012.53.K.Lin, C., J.Y. Wang, and A.S. Wang, 台灣地區汽車客運多場站車輛排程問題之研究, 交通部運輸研究所. 2009.
54.Gualandi, S. and F. Malucelli, Constraint programming-based column generation. 4or-a Quarterly Journal of Operations Research, 2009. 7(2): p. 113-137.
55.葉珮婷, 應用變數產生法求解有時間窗限制的收送貨問題, 國立交通大學碩博士論文. 2008.56.鄒筱薇, 數量受限制之多尺寸材料切割問題, 國立成功大學碩博士論文. 2010.57.Wolosewicz, C., S. Dauzère-Pérès, and R. Aggoune, A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem. European Journal of Operational Research, 2015. 244(1): p. 3-12.
58.Fu, Y.-M. and A. Diabat, A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem. Applied Mathematical Modelling, 2015. 39(3-4): p. 1194-1201.
59.古宇翔, 台鐵列車服務計畫之研究, 國立成功大學碩博士論文. 2012.