[1]Agnihothri, S. R. & Kenett, Ron S. (1995). Impact of defects on a process with rework. European Journal of Operational Research, 80 (2), 308-327.
[2]Beatriz Abdul-Jalbar, Jose’ M. Gutie’ rrez, Joaquı’n Sicilia. (2007) An integrated inventory model for the single-vendor two-buyer problem. Int. J. Production Economics, 108, 246–258
[3]Bhaba R. S. & Gyana R. P. (1996).Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system. European Journal of Operational Research, 89, 593-608
[4]Chiu, S.W. & Chiu, Y.P. (2005). The finite production model with the reworking of defective items. International Journal of Industrial Engineering, 12(1),15-20.
[5]Chiu, Y.P., Chiu, S.W. & Chao, H.C. (2008). Effect of shortage level constraint on finite production rate model with rework. Journal of Scientific and Industrial Research, 67 (2), pp. 112-116. Cited 2 times.
[6]Diponegoro, A.S. & Bhaba R. (2006). Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries. Computers & Operations Research, 33, 2387-2404
[7]Feng, D.Z. & Yamashiro, M. (2005). Optimal production policy for a manufacturing system with volume flexibility in a supply chain under lumpy demand. International Journal of Advanced Manufacturing Technology, 25 (7-8), 777-784.
[8]Goyal, S.K., Huang, C.K. & Chen, K.C. (2003). A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning and Control, 14 (7), 596-602.
[9]Harris Ford W. (1913). “How many parts to make at once? ”, The Magazines of Management, 10, 135-152.
[10]Hayek, P.A. & Salameh, M.K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, 12( 6) ,584-590.
[11]Hill, R.M. (1999). The optimal production and shipment policy for the single-vendor single buyer integrated production-inventory problem. International Journal of Production Research, 37(11), 2463-2475.
[12]Hill, R.M. & Omar, M. (2006). Another look at the single-vendor single-buyer integrated production-inventory problem. International Journal of Production Research, 44 (4), 791-800.
[13]Hoque, M.A. & Goyal, S.K. (2000). An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment. International Journal of Production Economics, 65(3), 305-315.
[14]Hsiao, Y.C. (2008). Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. International Journal of Production Economics,115(1), 229-235.
[15]Inderfurth, K., Janiak, A., Kovalyov, M.Y. & Werner, F. (2006). Batching work and rework processes with limited deterioration of reworkables. Computers and Operations Research, 33 (6), 1595-1605.
[16]Inderfurth, K., Kovalyov, M.Y., Ng, C.T. & Werner, F. (2007). Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. International Journal of Production Economics, 105 (2), 345-356.
[17]Jamal, A.M.M., Sarker, B.R. & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering, 47 (1), 77-89.
[18]Li, C.L., Vairaktarakis, G., & Lee, C.Y. (2005). Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research, 164 (1), 39-51.
[19]Lu Lu. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312-323 .
[20]Nahmias, S. Production & Qperations Analysis, 2009, 218-239 (McGraw-Hall, New York).
[21]Ojha, D., Sarker, B.R., & Biswas, P. (2007). An optimal batch size for an imperfect production system with quality assurance and rework. International Journal of Production Research, 45 (14), 3191-3214.
[22]Rardin, R. L. Optimization in operations research, 1998, 739-741. ( Prentice Hall , New Jersey).
[23]Rosenblat, M.J. & Lee, H.L. (1986). “Economic production cycles with imperfect production processes”, IIE Transactions,18, 48-55.
[24]Sarker, R.A. & Khan, L.R. (1999). Optimal batch size for a production system operating under periodic delivery policy. Computers and Industrial Engineering, 37 (4), 711-730.
[25]Sarker, R.A. & Khan, L.R. (2001). An optimal batch size under a periodic delivery policy. International Journal of Systems Science, 32 (9), 1089-1099.
[26]Silver, E. A., Pyke, D. F. & Peterson, R. Inventory Management and Production Planning and Scheduling. 1998, pp.151-172 (John Wiley & Sons, Inc, New York).
[27]Taft, E.W., (1918). “The most economical production lot”, The Iron Age,101, 1410-1412.
[28]Tersine, R. J. Principles of Inventory and Materials Management, 1994, 121-129 (PTR Prentice-Hall, New Jersey).
[29]Teunter, R.H. & Flapper, S.D.P. (2003). Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum, 25 (1), 85-96.
[30]Yang, P.C. & Wee, H.M. (2002). A single-vendor and multiple-buyers production–inventory policy for a deteriorating item. European Journal of Operational Research, 143, 570–581.
[31]王聖嘉,「探討經濟生產批量模式含不良品重工之最佳決策」,博士論文,中原大學工業工程研究所,台中(2003)。[32]吳碧玉,「不完美品質生產系統之最佳經濟生產批量之探討」,碩士論文,朝陽科技大學工管所,台中(2002)。[33]邱俊霖,「探討非連續配送與不良品可完全重工修復對經濟生產批量決策之影響」,碩士論文,朝陽科技大學工管所,台中(2008)。[34]趙皇傑,「在含不良品重工修復程序之生產環境下的重要決策分析」,碩士論文,朝陽科技大學工管所,台中(2003)。[35]蔡依齡,「允許部分欠撥下不完美生產系統之經濟批量」,碩士論文,私立真理大學管理科學研究所,台北(2003)。