|
Taipei City was officially announced to host 2017 Universiades by International University Sports Federation (FISU). Ever since the Olypmic Gmaes, the Universiades have continued to attract more and more countries and participants. The expansion of university sport around the world created a new need for meets and competitions to complete the Universiade programme. As a consequence, it is also an opportunity for Taipei City to involve international affair and introduce itself to the world since Deaflympic 2009 and Flora Expo 2010. To host International sports games, prepared within all majority fields in administration, including Massive public works projects or municipal construction. Since Munich massacre 1975, Olympics budget problem crash down Athens 2004 and Boston Marathon bombings 2013, etc. Those cases study shows that the “Risk Arrangements” are truly necessary to be well-established, not only the damage of public property or loss of assets but also the cost of life. Thesis of study case focuses on related references research and methods of “Risk Managements”. And there are 7 topics involved, “Organization and Strategic Development ”, ”Field organize and prepare”, ”Media Relation and Operate Planning”, ”Personnel participate and Completion organize”, ”Security management of execution” and “Others”. Then we sort out questions by most likely dangerous fields and execute questionnaire survey to persons who were security categorizations, such as military, police and professional instructors, etc. Input data running by ORMIT soft program, turned the result to Risk Management occur rate and Affection rate. And the results proved that works well and practical. Results of study: Extremely High risk level 2, one case in total. High risk level 4, 36 cases in total. Risk Ration is declining by evaluation results. And Average Risk Index (ARI) is going down to 6.34 from 15.58 (original ARI). ARI 6.34 is lower comparing with simulating ARI data 8.99. More, the Average Risk Rate (ARR) is going down to Low Risk level 15 (L-15) from High Risk level 5(H-5). ARR L-15 is lower comparing with simulating ARR data Middle Risk level 12. Those data proved mostly likely improvement suggestion of thesis are effective and working.
|