參考文獻
1.Barlishen, K. D. and Baetz, B. W., “Development of a decision support system for municipal solid waste management systems planning”, Waste Management & Research, 14, pp. 71–86, (1996).
2.Solano a, E., Ranjithan, S. R., Barlaz, M. A. and, Brill, E. D., “Life-cycle-based solid waste management. I: Model development”, J. Environ. Eng.-ASCE, 128(10), 981–992, (2002).
3.Solano b, E., Ranjithan, R., Barlaz, M. A., Brill, E. D. and, Dumas, R. D., “Life Cycle Based Solid Waste Management II: Illustrative Applications”, Journal of Environmental Engineering-ASCE, 128(10), 993–1005, (2002).
4.Ignatenko, A. and Schaik, M. A. R., “Recycling system flexibility: the fundamental solution to achieve high energy and material recovery quotas”, (2006).
5.Park H. S. and Choi H. W., “Disassembly Process Planning of End-of-Life Car”, International Journal of Precision Engineering and Manufacturing, Vol. 6, No. 1, (2005).
6.Basson, L. and Petrie, J.G., “An integrated approach for the consideration of uncertainty in decision making supported by Life Cycle Assessment”, Environmental Modelling & Software, 22, pp. 167–176, (2007).
7.Lo, S. C., Ma, H. W. and Lo, S. L., “Quantifying and reducing uncertainty in life cycle assessment using the Bayesian Monte Carlo method”, Science of the Total Environment, 340, pp. 23–33, (2005).
8.Hung, M. L. and Ma, H. W., “Quantifying system uncertainty of life cycle assessment based on Monte Carlo simulation”, International Journal of Life Cycle Assessment, 14, pp. 19–27, (2009).
9.Chang, N. B. and, Wang, S. F., “Solid Waste Management System Analysis by Multi objective Mixed Integer Programming Model”, Journal of Environmental Management, 48, 17–43, (1995).
10.Barlishen, K. D. and, Baetz, B. W., “Development of a decision support system for municipal solid waste management systems planning”, Waste Management & Research, 14, 71–86, (1996).
11.Buttol, P., Masoni, P., Bonoli, A., Goldoni, S., Belladonna, V. and, Cavazzuti, C., “LCA of integrated MSW management systems: Case study of the Bologna District”, Waste Management, 27, 1059–1070, (2007).
12.Heijungs, R. & Huijbregts, M.A.J. “A review of approaches to treat uncertainties in LCA”. In Complexity and Integrated Resource Management, Transactions of the 2nd Biennial Meeting of the International Environmental Modelling and Software Society (iEMSS) Vol. 1 (pp. 332-339). Mann, Switzerland: IEMSS, (2004).
13.E. Tempelman, “Multi-parametric study of the effect of materials substitution on life cycle energy use and waste generation of passenger car structures”, Transportation Research Part D, (2011).
14.Cinquepalmi et al., “Reuse of cement-solidified municipal incinerator fly ash in cement mortars:Physico-mechanical and leaching characteristics”, Journal of Hazardous Materials, (2008).
15.N.Y. Amponsah et al., “Impact of building material recycle or reuse on selected emergy ratios”, Resources, Conservation and Recycling, (2012).
16.J.K. Andersen et al., “Home composting as an alternative treatment option for organic household waste in Denmark: An environmental assessment using life cycle assessment-modelling”, Waste Management, (2012).
17.He, L,. Huang, G. H. and Zeng G. Lu., “An Inverval Mixed-Integer Semi-Infinite Programming Method for Municipal Solid Waste Management”, Air & Waste Manage, (2009).
18.Slagstad, H., Brattebo, H., “LCA for household waste management when planning a new urban settlement,” Waste Management, Vol. 32, pp. 1482-1490, (2012).
19.台灣檢驗科技股份有限公司,廢機動車輛源頭減量及再利用分析規劃暨廢車粉碎廠監督營運專案工作計畫,行政院環境保護署,(2012)。
20.台灣黃頁詢價平台,富川原企業社,(2015)。
(http://0222644816.tw66.com.tw/)
21.財團法人環境資源研究發展基金會,「廢機動車輛回收處理技術館裡與策略研討會論文集」,(2000)。
22.順成環保企業社,(2015)。
23.李育明,「國內推動生命週期評估應用之回顧與展望」,國立台北大學資源管理研究所,(2003)。
24.南條道夫,「都市鉱山開発――包括的資源観によるリサイクルシステムの位置付け」,東北大學選鑛製錬研究所彙報,(1988)。
25.莊宜剛、姚慧怡,「台灣發展銅冶煉的未來契機」,永續產業發展季刊59號,第72-79頁,(2012)。26.蔡敏行、張祖恩、鄭智和、蔡尚林,「建構國內二次銅資源循環體系之探討」,國立成功大學環境工程學系,(2013)。
27.劉文海,「鋁合金與鋼鐵於汽車應用之競爭動向」,財團法人金屬工業研究發展中心,(2007)。
28.張祖恩,「環境科技未來發展與績效管理—廢棄物與資源循環」,國立成功大學環境工程學系,(2014)。
29.內政部營建署,污水下水道設計指南,(2004)。
30.財政部南區國稅局,銅鉛鋁業原物料耗用通常水準,第18頁表7,(2009)。
31.曾迪華、潘時正,「下水道污泥處理置之現況與展望」,台灣工程實務研討會論文集,臺北,第 3-15 頁, (2007)。
32.李曼君,行政院環境保護署廢機動車輛源頭減量及再利用分析規劃暨廢車粉碎廠監督營運專案工作計畫,行政院環境保護署,臺灣檢驗科技股份有限公司,(2013)。
33.李曼君,行政院環境保護署應回收容器責任業者基線資料建置暨回收推廣專案工作計畫,財團法人臺灣產業基金會,(2013)。
34.李昊縢,「都市家戶能資源耗用分析-以臺中市為例」,碩士論文,朝陽科技大學環境工程與管理系,臺中,(2015)。35.劉乃綸,行政院環境保護署廢機動車輛回收清除處理體系暨源頭減量分析規劃專案工作計畫,臺灣檢驗科技股份有限公司,(2009)。
36.行政院環保署,列管污染源資料查詢系統,(2014-2015)。
(http://prtr.epa.gov.tw/)
37.行政院環境保護署,應回收廢棄物回收清除處理稽核認證作業手冊(廢機動車輛類─回收業),2014。
38.許金鐘,「不確定條件下廢汽車拆解優選模式之建立」,碩士論文,朝陽科技大學環境工程與管理系,臺中,(2011)。39.黃柏璋,「結合生命週期評估探討廚餘處理之最佳化模式」,碩士論文,朝陽科技大學環境工程與管理系,臺中,(2010)。40.黃繼賢,「國內廢車回收 3R 計算建議與成本分析」,碩士論文,朝陽科技大學環境工程與管理系,臺中,(2008)。41.劉峻岳,「成本因子對廢車塑膠零件拆解之影響」,碩士論文,朝陽科技大學環境工程與管理系,臺中,(2015)。42.鄭日賢,「臺灣廢車回收與物質循環」,上啟源環保科技股份有限公司,2011。
43.中興工程顧問股份有限公司,102 年推動焚化底渣再利用計畫,行政院環境保護署,2012。
44.伍中流,行政院環境保護署廢機動車輛源頭減量及再利用分析規劃暨廢車粉碎廠監督營運專案工作計畫,臺灣檢驗科技股份有限公司,2012。