[1]Aderohunmu, R., Mobolurin, A., and Bryson, N. Joint vendor-buyer policy in JIT manufacturing. (1995) Journal of the Operational Research Society, 46 (3), 375-385.
[2]Agnihothri, S. R. and Kenett, R. S., “Integrated production inventory models for imperfect production processes under inspection schedules”, Computers and Industrial Engineering, Vol. 44, Issue 4, pp. 633-650 (2003)
[3]Agnihothri, S. R. and Kenett, R. S., “The impact of defects on a process with rework”, European Journal of Operational Research, Vol. 80, Issue 2, pp. 308-327 (1995).
[4]Ahmad Diponegoro, Bhaba R. Sarker, “Finite horizon planning for a production system with permitted shortage and fixed interval deliveries”, Computers & Operations Research, 33, 2387–2404 (2006).
[5]Beatriz Abdul-Jalbar, Jose’ M. Gutie’ rrez, Joaquı’n Sicilia, “An integrated inventory model for the single-vendor two-buyer problem”, Int. J. Production Economics, 108, 246–258 (2007).
[6]Bhaba R. Sarker, Gyana R. Parija, “Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system”, European Journal of Operational Research, 89, 593-608 (1996).
[7]Buscher U, Lindner G. Optimizing a production system with rework and equal sized batch shipments. (2007) Computers & Operations Research, 34, 515-535.
[8]Chiu S.W. “Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging”, Applied Stochastic Models in Business and Industry, Vol. 23, No. 2, pp.165-178 (2007).
[9]Chiu, S. W., Wang, Shan-Ling and Chiu, Y. Peter, “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns”, European Journal of Operational Research Vol. 180, Issue 2, pp. 664-676 (2007).
[10]Chiu, S.W. and Chiu, Y.P., “An economic production quantity model with the rework process of repairable defective items”, Journal of information & optimization sciences, Vol. 24, No. 3, pp.569-582 (2003).
[11]Chiu, S.W. and Chiu, Y.P., “The finite production model with the reworking of defective items”, International Journal of Industrial Engineering, Vol. 12, No. 1, pp.15-20 (2005).
[12]Chiu, S.W. and Gong, Dah-Chuan, “Determining the optimal lot size for the finite production model with an imperfect rework process of defective items”, Journal of Information & Optimization Sciences, Vol. 25, No. 1, pp.105-119 (2004).
[13]Chiu, S.W., Gong, Dah-chuan and Wee, Hui-Ming, “Effects of random defective rate and imperfect Rework Process on economic production quantity model”, Janpan Journal of Industrial & Applied Mathmatics, vol. 21, No. 3, pp. 375-389 (2004).
[14]Chiu, Y.P. and Chiu, S.W., “A finite production model with random defective rate and shortages allowed and backordered”, Journal of Information & Optimization Sciences, Vol. 24, No. 3, pp.553-567 (2003).
[15]Chiu, Y.P., “Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging”, Engineering Optimization, Vol. 35, No. 4, pp.427-437 (2003).
[16]Chiu, S.W. Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific and Industrial Research, 66 (12), pp. 979-988. Cited 3 times. (2007)
[17]Diponegoro, Ahmad, Sarker, Bhaba R., “Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries”, Computers & Operations Research, 33, 2387–2404 (2006)
[18]Goyal, S.K. Integrated Inventory Model for a Single Supplier - Single Customer Problem. (1977) International Journal of Production Research, 15 (1), 107-111.
[19]Goyal, S.K. Integrated inventory model for a single product system. Operational Research Quarterly, 28 (3), 539-545. (1977)
[20]Goyal, S.K. and Gupta, Y.P. Integrated inventory models: The buyer-vendor coordination. (1989) European Journal of Operational Research, 41 (3), 261-269.
[21]Goyal, S.K., Huang, C.-K., Chen, K.-C. A simple integrated production policy of an imperfect item for vendor and buyer. (2003) Production Planning and Control, 14 (7), 596-602.
[22]Goyal, S.K. and Nebebe, F. Determination of economic production–shipment policy for a single-vendor-single-buyer system. (2000) European Journal of Operational Research, 121 (1), 175-178.
[23]Hans Siajadi, Raafat N. Ibrahim, Paul B. Lochert, “Joint economic lot size in distribution system with multiple shipment policy”, Int. J. Production Economics, 102, 302–316 (2006).
[24]Harris, Ford W., “How many parts to make at once”, The Magazines of Management, Vol.10, pp. 135-152 (1913).
[25]Hayek, P. A. and Salameh, M. K., “Production lot sizing with the reworking of imperfect quality items produced”, Production Planning and Control, Vol. 12,No. 6 ,pp. 584-590 (2001).
[26]Hill, R.M. Optimizing a production system with a fixed delivery schedule. Journal of the Operational Research Society, 47 (7), pp. 954-960.(1996).
[27]Hill R.M. The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. (1999) International Journal of Production Research, 37(11), 2463-2475.
[28]Huang, C.-K. An integrated vendor-buyer cooperative inventory model for items with imperfect quality. (2002) Production Planning and Control, 13 (4), 355-361.
[29]Inderfurth, K., Kovalyov, M. Y., Ng, C. T. and Werner, F., “Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables”, International Journal of Production Economics, Vol. 105, pp. 345-356 (2007).
[30]Jamal, A.M.M., Sarkerb, B. R., and Mondal, S., “Optimal manufacturing batch size with rework process at a single stage production system”, Computers & Industrial Engineering ,47, pp77–89 (2004).
[31]Jamal, A.M.M. , Sarker, B.R. , Mondal, S.Optimal manufacturing batch size with rework process at a single-stage production system.(2004) Computers and Industrial Engineering, 47 (1), pp. 77-89. Cited 13 times.
[32]K. Ertogral, M. Darwish, M. Ben-Daya, “Production and shipment lot sizing in a vendor–buyer supply chain with transportation cost”, European Journal of Operational Research, 176, 1592–1606 (2007).
[33]Kim, C.H., and Hong, Y., “An extended EMQ model for a failure prone machine with general lifetime distribution”, International Journal of Production Economics Vol. 49, pp.215.223 (1997).
[34]Lee, H.L. “Lot sizing to reduce capacity utilization in production process with defective items, process corrections, and rework”, Management Science, 38(9), 1314–1328 (1992).
[35]Leung, Kit-Nam Francis, “A generalized geometric-programming solution to “An economic production quantity model with flexibility and reliability considerations””, European Journal of Operational Research, 176, 240–251 (2007).
[36]Liu, J.J. and Yang, P., “Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs”, European Journal of Operational Research, Vol. 91, pp.517-527 (1996).
[37]Liu, N., Kim, Y., Hwang, H.An optimal operating policy for the production system with rework. Computers and Industrial Engineering, . Article in Press (2008).
[38]Lu Lu, “A one-vendor multi-buyer integrated inventory model”, European Journal of Operational Research, 81, 312-323 (1995).
[39]Nahmias, S. Production & Qperations Analysis, 2009, 218-239 (McGraw-Hall, New York).(EPQ books)
[40]Ojha, D., Sarker, B.R., and Biswas, P. An optimal batch size for an imperfect production system with quality assurance and rework. (2007) International Journal of Production Research, 45 (14), 3191-3214.
[41]Parija, G.R. , Sarker, B.R.Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Transactions (Institute of Industrial Engineers) , 31 (11), pp. 1075-1082. Cited 21 times (1999).
[42]P.C. Yang, H.M. Wee, “A single-vendor and multiple-buyers production– inventory policy for a deteriorating item”, European Journal of Operational Research, 143, 570–581 (2002).
[43]Porteus, E.L., “Optimal lot sizing, process quality improvement, and setup cost reduction”, Operations Research, Vol. 34, 137-144 (1986).
[44]Rardin, R. L. Optimization in operations research, 1998, 739-741. ( Prentice Hall , New Jersey).
[45]ROGER M. HILL , “The optimal production and shipment policy for the single-vendor singlebuyerintegrated production-inventory problem”, International Journal of Production Research, vol. 37, no. 11, 2463-2475 (1999)
[46]Rosenblat, M.J. and Lee, H.L., “Economic production cycles with imperfect production processes”, IIE Transactions, Vol. 18, pp.48-55 (1986).
[47]Ruhul A. Sarker, Lutfar R. Khan, ” An optimal batch size for a production system operating under periodic delivery policy”, Computers & Industrial Engineering, 37, 711-730 (1999).
[48]Sarker, B.R., Jamal, A.M.M., Mondal, S. Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research , 184 (3), 915-929. (2008)
[49]Schwaller, R.L., “EOQ under inspection costs”, Production and Inventory Management Vol. 29, pp.22-24 (1988).
[50]Silver, E. A., Pyke, D. F., and Peterson, R. inventory Management and Production Planning and Scheduling. 1998, pp.151-172 (John Wiley & Sons, Inc, New York).
[51]Taft, E.W., “The most economical production lot”, The Iron Age, Vol. 101, May 30, pp.1410-1412 (1918).
[52]Tersine, R. J. principles of Inventory and Materials Management, 1994, 121-129 (PTR Prentice-Hall, New Jersey).
[53]Walter, C.D.J., Inventory control and management (Chichester. Wiley) (1994)
[54]Wu, K. S. and Ouyang, L. Y., “(Q,r,L) Inventory model with defective items”, Computers and Industrial Engineering, Vol. 39, Issue 1-2, pp. 173-185 (2001).
[55]Yang P.C., Wee H.M. A single-vendor and multiple-buyers production-inventory policy for a deteriorating item. (2002) European Journal of Operational Research, 143 (3), 570-581.
[56]Yu-Cheng Hsiao.Ben-Daya, M., Al-Nassar, A.An integrated inventory production system in a three-layer supply chain. Production Planning and Control, 19(2),97-104. (2008)
[57]Zargar, Ali M. Effect of rework strategies on cycle time. Computers and Industrial Engineering, 29 (1-4), 239-243. (1995)
[58]王聖嘉,「探討經濟生產批量模式含不良品重工之最佳決策」,博士論文,中原大學工業工程研究所,台中(2003)。[59]吳碧玉,「不完美品質生產系統之最佳經濟生產批量之探討」,碩士論文,朝陽科技大學工管所,台中(2003)。[60]李俊逸,「含不良品部分可重工修復與良品分期運送之經濟生產批量最佳化」,碩士論文,朝陽科技大學工管所,台中(2008)。[61]林芝安,「在不完美重工生產系統下探討定量多次配送對生產批量與配送次數之最佳決策」,碩士論文,朝陽科技大學工管所,台中(2009) 。[62]邱俊霖,「探討非連續運送與不良品可完全重工修復對經濟生產批量決策之影響」,碩士論文,朝陽科技大學工管所,台中(2008)。[63]劉尚智,「研究定量多次運送與含不良品重工失敗率因素之最佳生產批量決策」,碩士論文,朝陽科技大學工管所,台中(2008) 。[64]鍾佳玲,「在不良品可完全重工修復與非連續性配送之生產系統下探討最佳批量與配送次數決策」,碩士論文,朝陽科技大學企業管理研究所,台中(2009)。