[1]T. Addison (2003), "E-commerce Project Development Risks: Evidence from a Delphi survey", International Journal of Information Management, Vol. 23, No. 1, pp. 25-40.
[2]D. Aloini., R. Dulmin., V. Mininno (2007), "Risk Management in ERP Project Introduction: Review of the Literature", Information and Management, Vol. 44, No. 6. pp. 547-567.
[3]L. Bally., J. Brittan., K. H. Wagner (1977), "A Prototype Approach to Information System Design and Development", Information and Management, Vol. 1, No. 1, pp. 21-26.
[4]H. Barki., S. Rivard., J. Talbot (1993), "Toward an Assessment of Software Development Risk", Jurnal of Management Information systems, Vol. 10, No.2, pp. 203-255.
[5]M. O. Barros., C. M. L. Werner., G. H. Travassos (2004), "Supporting Risks in Software Project Management", Journal of Systems and Software, Vol. 70 No.1-2, pp. 21-35.
[6]B. Boehm (1988), "A Spiral Model of Software Development and Enhancement", IEEE Computer, Vol.21, No. 5, pp. 61-72.
[7]B. W. Boehm (1991), "Software Risk Management:Principles and Practices", , IEEE Software, Vol. 8, No. 1, pp. 32-41
[8]R. N. Charette (1996), "Large-Scale Project Management Is Risk Management", IEEE Software, Vol. 13, No. 4, pp.110-117.
[9]R. N. Charette (2005), "Why Software Fails? " , IEEE Spectrum, Vol. 42, No. 9, pp. 42-49.
[10]T. Chen., J. Zhang., K. K. Lai (2009), "An Integrated Real Option Evaluating Model for Information Technology Prijects Under Multiple Risk", International Journal of Project Management, Vol. 27, No. 8, pp. 776-786.
[11]Department of Defense (1998), "Department of Defense Handbook Work Breakdown Structure MIL- HDBK- 881", Washington DC, pp.10-14.
[12]W. M. Han., S. J. Huang (2007), "An Empirical Analysis of Risk Components and Performance on Software Projects", Journal of Systems and Software, Vol. 80, No. 1, pp. 42-50.
[13]IBM (1997), Project Management Fundamentals Handbook.
[14]I. Jacobson., G. Booch., J. Rumbaugh (1999), "The Unified Software Development Process", Addison-Wesley Longman Publishing Co., Inc. Boston, MA, USA, pp. 6.
[15]K. Wiegers, "21 Project Management Success Tips", http://www.projectsmart.co.uk/21-project-management-success-tips.html (May, 2011).
[16]M. Keil., P. E. Cule., K. Lyytinen., R. C. Schmidt(1998), "Aframework for Identifying Software Project Risks", Communications of the ACM, Vol. 41, No. 11, pp. 76-83.
[17]M. Keil., L. Li., L. Mathiassen., G. Zheng (2008), "The Influence of Checklists and Roles on Software Practitioner Risk Perception and Decision-making", Journal of Systems and Software, Vol. 81, No.6, pp. 908-919.
[18]K. Beck (1999), "Embracing Change with Extreme Programming", IEEE Computer, Vol. 32, No. 10, pp.70–77.
[19]L. Wallace., M. Keil., A. Rai (2004), "How Software Project Risk Affects Project Performance: An Investigation of the Dimensions of Risk and an Exploratory Model, " Decision Sciences, Vol. 35, No. 2, pp. 289-321.
[20]M. J. Qureshi., S. A. Hussain (2007), "An Adaptive Software Development Process Model", Advances in Engineering Software, Vol. 39, No.8, pp. 654-658.
[21]F. W. McFarlan (1981), "Portfolio Approach to Information Systems", Havard Business Review. Vol. 59, No. 5, pp. 142-150.
[22]H. Mills (1971), "Top-Down Programming in Large Systems", Debugging Techniques in Large Systems, Englewood Cliffs, NJ: Prentice Hall, pp. 41-55.
[23]K. S. Na., J. T. Simpson., X. Li., T. Singh., K. Y. Kim (2007), "Software Development Risk and Project Performance Measurement: Evidence in Korea." Journal of Systems and Software, Vol. 80, No. 4, pp.593-605.
[24]R. T. Nakatsu., C. L. Lacovou (2009), "A Comparative Study of Important Risk Factors Involved in Offshore and Domestic Outsourceing of Software Development Projects: A two-panel Dephi Study", Information and Management, Vol. 46, No. 1, pp. 57-68.
[25]Project Management Institute (2008), A Guide to the Project Management Body of Knowledge Fourth Edition (PMBOK® Guide), USA: Project Management Institute, Inc.
[26]J. S. Reel (1999), "Critical Success Factors in Software Projects", IEEE Software, Vol. 16, No. 3, pp.18-23.
[27]R. Black (2005), "Proper Planning Can Help Project Managers Avoid Raging Fires", Computing Canada, Vol. 31, No. 16.
[28]W. W. Royce (1970), "Managing the Development of Large Software Systems", Proceedings of IEEE Wescon, pp.1-9.
[29]R. Schmidt., K. Lyytinen., M. Keil., P. Cule (2001), "Identifying Software Project Risk: An international Delphi Study", Jurnal of Management Information Systems, Vol. 17, No. 4, pp. 5-36.
[30]Standish Group International (2009), New Standish Group Report Shows More Project Failing and Less Successful Projects. http://standishgroup.com/newsroom/chaos_2009.php (May, 2011).
[31]M. Sumner (2000), "Risk Factor in Enterprise-Wide/ERP Project", Journal of Information Technology, Vol. 15, No. 4, pp.317-327.
[32]S. J. Huang., W. M. Han (2008), "Exploring the Relationship Between Software Project Duration and Risk Exposure: A Cluster Analysis", Information and Management, Vol. 45, pp. 175-182.
[33]W. Brown.et al. (1998), Refactoring Software, Architectures and Projects in Crisis, New York: Wiley Computer Publishing.
[34]Y. Hu., J. Huang., J. Chen., M. Liu., K. Xie (2007), " Software Project Risk Management Modeling with Neural Network and Support Vector Machine Approaches", IEEE Natural Computation, Vol. 3, pp. 358-362.
[35]王琮信(2004),極致編程(XP)於校園內軟體開發專案之應用,碩士論文,國立政治大學資訊管理研究所,台北。[36]牟登秀(2008),建構知識導向之專案經驗模型於風險監控,碩士論文,中原大學資訊管理研究所,桃園。[37]吳明隆、涂金堂(2005),SPSS與統計應用分析,五南圖書。
[38]吳俊霖(2006),師資培育歷程檔案系統的設計與建置,碩士論文,國立交通大學教育研究所,新竹。[39]林信惠、黃明祥、王文良,軟體專案管理(再版)(2005),智勝文化事業有限公司。
[40]洪茂峰(2009),架構導向專案風險管理模型之研究,碩士論文,國立中山大學資訊管理學系研究所,高雄。[41]張文貴(2001),「軟體技術文件標準手冊之編訂」,軟體產業通訊,第40期,第28-34頁。[42]張家豪(2005),軟體風險因子之動態辨識與分析,碩士論文,國立臺灣科技大學資訊管理系,台北。[43]曹正城(2008),不同軟體專案類型之品質因素探討,碩士論文,世新大學資訊管理學研究所,台北。[44]陳榮靜、劉延純、楊政豐(2011),「運用風險因子識別與分析在軟體發展流程選擇」,電子商務學報(TSSCI),第十三卷,第二期,第389-412頁。
[45]黃世禎(2007),「以群聚方法探討軟體風險因子發生機率與嚴重性對專案績效之影響」,行政院國家科學委員會專題研究計畫成果報告,編號:NSC96-2416-H-001-009。
[46]楊政豐(2008),導入風險評估機制於軟體專案規模預估準確度改善之研究,碩士論文,東海大學資訊工程與科學研究所,台中。[47]褚如君、陳秀華、詹景勛(2010),數位典藏叢書01數位化工作流程指南:專案規劃,數位典藏與數位學習國家型科技計畫 拓展台灣數位典藏計畫發行,第30頁。
[48]趙善中、郭麗齡、尤柄文(2009),使用軟體架構模型:軟體工程,儒林圖書有限公司,第6-7頁。
[49]鄭炳強(2007),軟體工程:從實務出發,智勝文化,第176-204頁。
[50]藍元志(2003),專案風險管理回應策略選擇模式之建立,碩士論文,國立中央大學工業管理研究所,桃園。[51]顏春煌(2009),軟體工程理論與實務應用,碁峰資訊股份有限公司。