參考文獻
[1] Aderohunmu, R., Mobolurin, A., and Bryson, N. Joint vendor-buyer policy in JIT manufacturing. (1995) Journal of the Operational Research Society, 46 (3), 375-385
[2] Agnihothri, S.R.and Kenett, R.S., “Integrated production-inventory models for imperfect production processes under inspection schedules”, Computers and Industrial Engineering, Vol. 44, Issue 4, pp.633-650 (2003)
[3] Agnihothri, S.R. and Kenett, R.S., “The impact of defects on a process with rework”, European Journal of Operational Research, Vol. 80, Issue 2, pp.308-327 (1995)
[4] Beatriz, Abdul-Jalbar, Jose’ M. Gutie’ rrez, Joaquı’n Sicilia, “An integrated inventory model for the single-vendor two-buyer problem”, Int. J. Production Economics, 108, 246–258 (2007)
[5] Ben-Daya, M., Noman, S.M. and Hariga M., “Integrated inventory control and inspection policies with deterministic demand”, Computers & Operations Research 33 pp.1625–1638 (2006)
[6] Bhaba, R. Sarker, Gyana R. Parija, “Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system”, European Journal of Operational Research, 89, 593-608 (1996).
[7] Cheng, T.C.E., “An economic order quantity model with demand-dependent unit production cost and imperfect production process,” IIE Transactions, Vol. 23,No. 1, pp.23-28 (1991)
[8] Chiu, Y.P. and Chiu, S.W., “An economic production quantity model with the rework process of repairable defective items”, Journal of information & optimization sciences, Vol. 24, No. 3, pp.569-582 (2003)
[9] Chiu, S.W. and Gong, Dah-Chuan., “Determining the optimal lot size for the finite production model with an imperfect rework process of defective items”, Journal of Information & Optimization Sciences, Vol.25, No.1,pp.105-119 (2004)
[10] Chiu, S.W. and Chiu, Y.P., “The finite production model with the rework of defective items”, International Journal of Industrial Engineering, Vol. 12, No. 1, pp.15-20 (2005)
[11] Chiu, S.W., Gong, Dah-chuan and Wee, Hui-Ming, “Effects of random defective rate and imperfect Rework Process on economic production quantity model”, Janpan Journal of Industrial & Applied Mathmatics, vol. 21, No. 3, pp. 375-389 (2004)
[12] Chiu, Singa Wang, “Determining the optimal lot size for the finite production model with an imperfect rework process of defective items”, Journal of Information & Optimization Sciences, Vol. 25, No. 1, pp. 105-119 (2004)
[13] Darwish, M.A. , Odah O.M. , Vendor managed inventory model for single-vendor multi-retailer supply chains. European Journal of Operational Research Volume 204, Issue 3, 1 August 2010, Pages 473-484
[14] Diponegoro, Ahmad, Sarker, Bhaba R., “Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries”, Computers & Operations Research, 33, 2387–2404 (2006)
[15] Ojha, D. Sarker, B. R. and Biswas, P., “An optimal batch size for an imperfect production system with quality assurance and rework”, International Journal of Production Research, Vol. 45, No. 14, 15 July 2007, 3191–3214(2007)
[16] Ertogral, K., Darwish, M., Ben-Daya, M., “Production and shipment lot sizing in a vendor–buyer supply chain with transportation cost”, European Journal of Operational Research, 176, 1592–1606 (2007)
[17] Goyal, Suresh K., Hoque, Mohammad A., ” A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and buyer”, Int. J. Production Economics, 102, 217-225 (2006)
[18] Goyal, S.K., Huang, C.-K., Chen, K.-C. “A simple integrated production policy of an imperfect item for vendor and buyer”, Production Planning and Control, 14 (7), 596-602(2003)
[19] Goyal, S.K. “Integrated Inventory Model for a Single Supplier - Single Customer Problem”, International Journal of Production Research, 15 (1), 107-111(1977)
[20] Goyal, S.K. and Gupta, Y.P. “Integrated inventory models: The buyer-vendor coordination,” European Journal of Operational Research, 41 (3), 261-269 (1989)
[21] Goyal, S.K. and Nebebe, F. ”Determination of economic production–shipment policy for a single-vendor-single-buyer system”, European Journal of Operational Research, 121 (1), 175-178(2000)
[22] Harris, Ford.W., “How many parts to make at once?,” The Magazines of Management, Vol. 10,pp.135-152 (1913)
[23] Hayek, P.A. and Salameh, M.K., “Production lot sizing with the reworking of imperfect quality items produced”, Production Planning and Control, Vol. 12,pp.584-590 (2001)
[24] Hill, R.M., “The optimal production and shipment policy for the single-vendor single buyer integrated production-inventory problem”, International Journal of Production Research, vol. 37, no. 11, 2463-2475 (1999)
[25] Huang, C.-K. “An integrated vendor-buyer cooperative inventory model for items with imperfect quality”, Production Planning and Control, 13 (4), 355-361(2002)
[26] Inderfurth, K., Kovalyov, M.Y., Ng, C.T. and Werner, F., “Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables”, International Journal of Production Economics, Vol. 105, pp. 345-356 (2007)
[27] Jamal, A.M.M., Sarker, B.R., and Mondal, S., “Optimal manufacturing batch size with rework process at a single-stage production system”, Computers & Industrial Engineering ,47, pp77–89 (2004)
[28] Jung, Hoon and Cerry M. Klein, “Optimal inventory policies for an economic order quantity model with decreasing cost functions”, European Journal of Operational Research, 165, pp 108–126 (2005)
[29] Kim, Chang Hyun, Hong, Yushin, “An optimal production run length in deteriorating production processes”, International Journal of Production Economics, 58, pp.183-189 (1999)
[30] Kim, C.H., Hong, Y. and Kim, S.Y., “An extended optimal lot sizing model with an unreliable machine”, Production Planning and Control 8 (6), 577–585 (1997)
[31] Lee, H.L. “Lot sizing to reduce capacity utilization in production process with defective items, process corrections, and rework”, Management Science, 38(9), 1314–1328 (1992)
[32] Leung, Kit-Nam Francis, “A generalized geometric-programming solution to “An economic production quantity model with flexibility and reliability considerations””, European Journal of Operational Research, 176, 240–251 (2007)
[33] Liu, J. J. and Yang, P., “Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs”, European Journal of Operational Research, Vol. 91, pp.517-527 (1996)
[34] Lu Lu, “A one-vendor multi-buyer integrated inventory model”, European Journal of Operational Research, 81, 312-323(1995)
[35] Parija, G.R. , Sarker, B.R.Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Transactions(Institute of Industrial Engineers), 31 (11), pp. 1075-1082. Cited 21 times (1999).
[36] Porteus, E.L., “Optimal lot sizing, process quality improvement, and setup cost reduction”, Operations Research, 34, 137-144 (1986)
[37] Rosenblatt, M.J. and Lee, H.L. , “Economic production cycles with imperfect production processes”, IIE Transactions, Vol. 18, pp. 48-55 (1986)
[38] Sarker, Bhaba R., Parija, Gyana R., “Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system”, European Journal of Operational Research, 89, 593-608 (1996)
[39] Siajadi, Hans, Ibrahim, Raafat N., Lochert, Paul B., “Joint economic lot size in distribution system with multiple shipment policy”, Int. J. Production Economics, 102, 302–316 (2006)
[40] Salameh, M.K. and Jaber, M.Y., “Economic production quantity model for items with imperfect quality”, International Journal of Production Economics, Vol. 64, pp.59-64 (2000)
[41] Sarker, Ruhul A., Khan, Lutfar R., “An optimal batch size for a production system operating under periodic delivery policy”, Computers & Industrial Engineering, 37, 711-730 (1999)
[42] Schwaller, R.L., “EOQ under inspection costs”, Production and Inventory Management . Vol. 29, pp.22-24 (1988)
[43] Taft, E.W., “The most economical production lot”, The Iron Age, Vol. 101, May 30, pp.1410-1412 (1918).
[44] Walter, C.D.J., “Inventory control and management” (Chichester. Wiley) (1994)
[45] Wu, K.S. and Ouyang, L.Y., “(Q,r,L) Inventory model with defective items”, Computers and Industrial Engineering, Vol. 39, Issue 1-2, pp. 173-185 (2001)
[46] Yang, P.C., , Wee, H.M., “A single-vendor and multiple-buyers production–inventory policy for a deteriorating item”, European Journal of Operational Research, 143, 570–581 (2002)
[47] Zhang, X. and Gerchak, Y., “Joint lot sizing and inspection policy in and EOQ model with random yield”, IIE Transactions, Vol. 22, pp. 41 (1990)
[48] 王聖嘉,「探討經濟生產批量模式含不良品重工之最佳決策」,博士論文,中原大學工業工程研究所,台中(2003)。[49] 林芝安,「在不完美重工生產系統下探討定量多次配送對生產批量與配送次數之最佳決策」,碩士論文,朝陽科技大學工管所,台中(2009)。[50] 吳碧玉,「不完美品質生產系統之最佳經濟生產批量之探討」,碩士論文,朝陽科技大學工管所,台中(2002)。[51] 趙皇傑,「在含不良品重工修復程式之生產環境下的重要決策分析」,碩士論文,私立朝陽科技大學工業工程與管理所,台中(2004)[52] 劉尚智,「研究定量多次配送與含不良品重工失敗率因素之最佳生產批量決策」,碩士論文,朝陽科技大學工管所,台中(2008)。[53] 蔡依齡,「允許部分欠撥下不完美生產系統之經濟批量」,碩士論文,私立真理大學管理科學研究所,臺北(2003)