1.Bartholomew-Biggs, M., Zuo, M.-J., Li, X., “Modelling and optimizing sequential imperfect preventive maintenance”,Reliability Engineering and System Safety 94: 53– 62 (2009).
2.Canfield, R.V., “Cost optimization of periodic preventive maintenance”, IEEE Transactions on Reliability, R-35: 78-81 (1986).
3.Cheng, C.-Y. and Chen, M., “The optimal periodic preventive maintenance policy with reliability limit for the case of degradation rate reduction”, Proceedings of the 2nd Asian International Workshop on Advanced Reliability Modeling (AIWARM2006), Busan, Korea, pp 203-210 (2006).
4.Cheng, C.-Y. and Chen, M., “The periodic maintenance policy for a Weibull life-time system with degradation rate reduction under reliability limit”, Asia-Pacific Journal of Operational Research, Volume: 25, Issue: 6 pp. 793-805 (2008).
5.Cheng, C.-Y. and Chen, M., and Guo, R., “The optimal periodic preventive maintenance policy with degradation rate reduction under reliability limit”,IEEE International Conference on Industrial Engineering and Engineering Management (IEEM2007), Singapore (2007).
6.Cheng, C.-Y. and Liu, H.-H., “The Finite Time Period Preventive Maintenance Policies with Failure Rate Reduction under A Warranty Consideration”, Journal of the Chinese Institute of Industrial Engineers, (2010).
7.Cheng, C.-Y., and Liu, H.-H., and Guo, R., “The Periodic Preventive Maintenance Policies with Failure Rate Reduction for a Finite Time Span”, Proceedings of the 3rd Asian International Workshop on Advanced Reliability Modeling (AIWARM2008), Taichung, Taiwan,pp362-p369, (2008).
8.Cheng, C.-Y., Sun, T.-H., Chen, J.-T., and Liu, M.-L., “The Degradation -Rate-Reduction Preventive Maintenance Policies with Warranty in a Finite Time Span”, IEEE International Conference on Industrial Engineering and Engineering Management (IEEM2009), Hong King (2009).
9.Jaturonnatee, J., Murthy, D.N.P., and Boondiskulchok, R., “Optimal preventive maintenance of leased equipment with corrective minimal repairs”, European Journal of Operational Research, 174: 201-215 (2006).
10.Lie, C.-H. and Chun, Y.-H., “An Algorithm for Preventive Maintenance Policy”, IEEE Transactions on Reliability, Vol.R-35, NO.1 (1986).
11.Lin, D., Zuo, M.J., Yam, R.C.M. and Meng, M.Q.H., “Optimal system design considering warranty, periodic preventive maintenance, and minimal repair”, Journal of the Operational Research Society, vol.51, pp.869-874 (2000).
12.Malik, M.A.K., “Reliable Preventive Maintenance Scheduling”, AIIE Transaction 11/3, pp.221-228(1979).
13.Martorell, S., Sanchez, A., and Serradell, V., “Age-dependent reliability model considering effects of maintenance and working conditions”, Reliability Engineering and System Safety, 64: 19-31(1999).
14.Nakagawa, T., “Imperfect preventive maintenance”, IEEE Transactions on Reliability, R-28: 331-332(1979).
15.Nakagawa T. “A summary of periodic replacement with minimal repair at failure”, Journal of the Operational Research Society, 24:213–27(1981).
16.Nakagawa, T., ”Periodic and Sequential Preventive Maintenance Policies”, Journal of Applied Probability R-23/2, pp.536-542(1986).
17.Nakagawa, T., ”Sequential Imperfect Preventive Maintenance Policies ”, IEEE Transactions on Reliability R-37/3, pp.295-298(1988).
18.Nakagawa, T. and Mizutani, S., “A summary of maintenance policies for a finite interval”, Reliability Engineering and System Safety, 94: 89-96(2009).
19.Park, D.H., Jung G.M., and Yum, J.K., “Cost Minimization for Periodic Maintenance Policy of a System Subject to Slow Degradation”, Reliability Engineering and System Safety 68, pp.105-112(2000).
20.Pham, H. and Wang, H., “Invited review: imperfect maintenance”, European Journal of Operational Research, 94: 425-438(1996).
21.Pongpech, J. and Murthy, D.N.P., “Optimal periodic preventive maintenance policy for leased equipment”, Reliability Engineering and System Safety, 91: 772-777 (2006).
22.Sheu, S.-H. and Chang, C.-C., “An Extended Periodic Imperfect Preventive Maintenance Model With Age-Dependent Failure Type” Reliability, IEEE Transactions on, Volume 58, Issue 2,Page(s):397 – 405(2009).
23.Yeh, R. H. and Chang, W. L., “Optimal Threshold Value of Failure-rate for Leased Products with Preventive Maintenance Actions,” Mathematical and Computer Modelling,46,pp.730-737 (2007).
24.Yeh, R.H. and Chen, C.-K., “Periodical preventive-maintenance contract for a leased facility with weibull life-time”, Quality & Quantity, 40: 303-313(2006).
25.Yeh, R. H., Kao, K. C. and Chang, W. L., “Optimal Preventive Maintenance Policy for Leased Equipment Using Failure Rate Reduction,” Computers and Industrial Engineering,Accepted (2009).
26.王銘哲,「老化型設備在有限時間域下之不完美預防維護政策」,碩士論文,朝陽科技大學工業工程與管理研究所,台中(2003)。27.吳南蒨,「失效率老化速率減緩之週期型預防維護模型」,碩士論文,朝陽科技大學工業工程與管理研究所,台中(2004)。28.紀冠安,「考慮成本與可靠度之不完全預防維護模型」,碩士論文,朝陽科技大學工業工程與管理研究所,台中(2001)。29.紀冠安、陳沅銘、鄭純媛,「一般週期預防維護模型對可靠度之影響」,中國工業工程學會90年度年會暨學術研討會(2001)。
30.張文亮,「考慮維修門檻值下租賃設備之最佳維修策略」,博士論文,台灣科技大學工業管理系,台北(2007)。31.陳沅銘,「一般週期預防維護模型系統之發展」,碩士論文,朝陽科技大學工業工程與管理研究所,台中(2002)。32.陳俊元,「有限時間域下考慮設備保固期與轉售價值之預防維護政策」,碩士論文,朝陽科技大學工業工程與管理研究所,台中(2009)。33.陳俊元、鄭純媛、孫德修、陳志宗,「有限時間域下考慮設備保固期與轉售價值之週期型預防維護政策」,中華民國第八屆可靠度與維護度技術研討會,(2009)。
34.陳學瑤,「考慮轉售市場價值與不同保養回復類型之租賃設備最佳預防維護政策」,碩士論文,朝陽科技大學工業工程與管理研究所,台中(2006)。35.楊朝順、林竹青、鄭純媛,「應用改善因子法於老化型設備之週期預防維護」,中華民國第五屆可靠度與維護度技術研討會,(2003)。
36.劉興祥,「在有限時間域下考慮設備保固之週期型預防維護政策」,碩士論文,朝陽技大學工業工程與管理研究所,台中(2008)。