參考文獻
1.Canfield, R. V. “Cost Optimization of Periodic Preventive Maintenance,” IEEE Transactions on Reliability, Vol.R-35, No.1,pp.78-81 (1986).
2.Chun, Y. H. “Optimal Number of Periodic Preventive Maintenance Operations under Warranty,” Reliability Engineering and System Safety 37, pp.223-225(1992).
3.Nakagawa, T., “Periodic and Sequential Preventive Maintenance Policies” Journal of Applied Probability R-23/2. pp.536-542(1986).
4.Yeh, Ruey Huei, Chen Ming-Yuh, Lin Chen-Yi, “Optimal Periodic Replacement Products under Free-repair Warranty”, European Journal of Operation Research, 176, pp.1678-1686(2007).
5.Park, D. H., Jung, G.M. and Yum, J. K., ”Cost Minimization for Periodic Maintenance Policy of a System Subject to Slow Degradation,” Reliability Engineering and System Safety, 68, pp.105-112(2000)
6.Shaomin Wu, Derek Clements-Croome, “Preventive Maintenance Models whit Random Maintenance Quality,” Reliability Engineering and System Safety, 90, pp.99-105(2005)
7.Zequeira R.I., Berenguer C. ”Periodic Imperfect Preventive Maintenance whit Two Categories of Competing Failure Modes” Reliability Engineering and System Safety, 91, pp.460-468(2006)
8.Jayablanm V. and Chaudhuri, D. ,”Cost Optimization of Maintenance Scheduling for a System with Assured Reliability,” Reliability Engineering and System Safety, 41,No.1 pp.21-25(1992)
9.Yeh, R. H. and Chang, W. L., “Optimal Threshold Value of Failure-rate for Leased Products with Preventive Maintenance Actions,” Mathematical and Computer Modelling, 46, pp.730-737 (2007).
10.Yeh, R. H. and Chen, C. K., “Periodical Preventive-Maintenance Contract for a Leased Facility with Weibull Life-Time,” Quality & Quantity, 40, pp.303-313 (2006).
11.Jaturonnatee, J., Murthy, D. N. P., and Boondiskulchok, R., “Optimal Maintenance of Leased Equipment with Corrective Minimal Repairs,” European Journal of Operational Research, 174, pp.201-215 (2006).
12.Pongpech, J. and Murthy, D. N. P., “Optimal Periodic Preventive Maintenance Policy for Leased Equipment,” Reliability Engineering & System Safety, 91, pp.772-777 (2006).
13.Pham, H. and Wang, H., “Invited Review:Imperfect Maintenance,” European Journal of Operational Research, Vol.94, pp.425-438 (1996).
14.Mathew, J. H. and Fink, K. D., Numerical Methods using Matlab (fourth edition), Pearson Education International, pp.409-446 (2004).
(fifth edition), Brooks/Cole-Thomson Learning, pp.656-682 (2004).
16.Yeh, R. H., Kao, K. C. and Chang, W. L., “Optimal Preventive Maintenance Policy for Leased Equipment Using Failure Rate Reduction,” Computers and Industrial Engineering, Accepted (2009).
17.Cheng, C. Y. and Liu, H. H., “The Period Preventive Maintenance Policies with Degradation Rate Reduction under a Warranty Consideration for A Finite Time Span,” The Journal of Chaoyang University of Technology, Accepted (2008).
18.Cheng, C. Y. and Liu, H. H., “The Finite Time Period Preventive Maintenance Policies with Failure Rate Reduction under a Warranty Consideration,” Journal of the Chinese Institute of Industrial Engineers, Accepted (2009).
19.陳學瑤,「考慮轉售市場價值與不同保養回復類型之租賃設備最佳預防維護政策」,碩士論文,朝陽科技大學工業工程與管理研究所,台中(2007)。20.劉興祥,「在有限時間域下考慮設備保固之週期型最佳預防維護政策」,碩士論文,朝陽科技大學工業工程與管理研究所,台中(2008)。