[1] Agnihothri, S. R. and Kenett, R. S., “The impact of defects on a process with rework”, European Journal of Operational Research, Vol. 80, Issue 2, pp. 308-327 (1995).
[2] Basari, A.S.H., Razali, H., Hussin, B., Asmai, S.A., Ibrahim, N.K., Shibghatullah, A.S. “The integration of simple Markov model in solving single line production system” 2011 7th International Conference on Information Technology in Asia: Emerging Convergences and Singularity of Forms - Proceedings of CITA''11, art. no. 5998611, . (2011)
[3] Bhaba R. Sarker, Gyana R. Parija, “Optimal batch size and raw material ordering policy for a production system with a fixed-interval. Lumpy demand delivery system” , European Journal of Operational Research, 89, 593-608(1996)
[4] Bilgen, B. “Application of fuzzy mathematical programming approach to the production allocation and distribution supply chain network problem.” Expert System with Applications, Vol. 37, No 6, pp. 4488-4495.
[5] Beatriz, Abdul-Jalbar, Jose’ M. Gutie’ rrez, Joaqui’n Sicilia “An integrated inventory model for the single-vendor two-buyer problem” International Journal Production Economics, 108, 246-258
[6] Buscher U, Lindner G. “Optimizing a production system with rework and equal sized batch shipments.” Computers & Operations Research, 34, 515-535. (2007)
[7] Chiu, S.W. “Robust planning in optimization for production system subject to random machine breakdown and failure in rework.” Computer & Operations Research 37 899-908 (2010).
[8] Cheng, T.C.E., Gao, C., Shen, H. “Production planning and inventory allocation of a single-product assemble-to-order system with failure-prone machines.” International Journal of Production Economics, 131 (2), pp. 604-617. (2011)
[9] Chiu, Y.-S.P. , Lin, H.-D. , Chang, H.-H. “Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown.” Computers and Industrial Engineering
, 60 (4), pp. 576-584. Cited 1 time. (2011)
[10] Chiu, S.W. , Lin, H.-D. , M.-F. Wu ,J.-Ch. Yang. “Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issue.” Scientia Iranica , Article In Press (2011).
[11] Cardenas-Barron, L.E. , Sarkar, B. , Trevino-Garza, G. “An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments.” Applied Mathematical Modelling, 37 (7), pp. 5549-5554. (2013)
[12] Chiu, S.W. and Chiu, Y.P., “An economic production quantity model with the rework process of repairable defective items”, Journal of information & optimization sciences, Vol. 24, No. 3, pp.569-582 (2003).
[13] Diponegoro, A., Sarker, B.R. “Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries.” Computers and Operations Research, 33 (8), 2387-2404. (2006)
[14] Ertogral, K., Darwish, M., Ben-Daya, M., “Production and shipment lot
sizing in a vendor–buyer supply chain with transportation cost”, European Journal of Operational Research, 176, 1592–1606 (2007).
[15] Groenevelt, H., Pintelon, L., Seidmann, A., “Production lot sizing with machine breakdowns” Management Sciences 38, 104-123 (1992).
[16] Goyal, S.K., Huang, C.K. & Chen, K.C. “A simple integrated production policy of an imperfect item for vendor and buyer.” Production Planning and Control, 14 (7), 596-602. (2003)
[17] Halim, K.A., Giri, B.C., Chaudhuri, K.S. ”Lot sizing in an unreliable manufacturing system with fuzzy demand and repair time.” International Journal of Industrial and Systems Engineering
, 5 (4), pp. 485-500. Cited 1 time. (2010)
[18] Hill, R.M. “Optimizing a production system with a fixed delivery schedule.” Journal of the Operational Research Society, 47(7), PP. 954-960.(1996)
[19] Hoque, M.A. & Goyal, S.K. “An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment.” International Journal of Production Economics, 65(3), 305-315. (2000).
[20] Hsiao, Y.C. “Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information.” International Journal of Production Economics,115(1), 229-235. (2008)
[21] Huang, C.-K. “An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration.” International Journal of Production Economics, 91(1), 91-98 (2004).
[22] Harris, Ford W., “How many parts to make at once”, The Magazines of Management, Vol.10, pp. 135-152 (1913).
[23] Jamal, A.M.M., Sarker, B.R. & Mondal, S. “Optimal manufacturing batch size with rework process at a single-stage production system.” Computers and Industrial Engineering, 47(1),77-89 (2004)
[24] King, C.H., Hong, Y., Kim, S-Y., “An extended optimal lot sizing model with an unreliable machine.” Production Planning and Control, 8(6)577-585(1997)
[25] Nourelfath, M. “Service level robustness in stochastic production planning under random machine breakdowns.” European Journal of Operational Research, 212 (1), pp. 81-88. (2011)
[26] Noorollahi, E., Karimi-Nasab, M., Aryanezhad, M.B. “An economic production quantity model with random yield subject to process compressibility” Mathematical and Computer Modelling, 56 (3-4),
pp. 80-96. (2012)
[27] Ojha, D., Sarker B.R., and Biawas, P. “An optimal batch size for an imperfect production system with quality assurance and rework.” International Journal Production Reasearch, 45 (14), 3191-32414 (2007)
[28] Prakash, O., Roy, A.R., Goswami, A. “Stochastic manufacturing system with process deterioration and machine breakdown.”
International Journal of Systems Science, . Article in Press. (2013)
[29] Parija, G.R. , Sarker, B.R. “Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers.” IIE Transactions (Institute of Industrial Engineers)
, 31 (11), pp. 1075-1082. Cited 21 times. (1999)
[30] Sarker, R.A. , Khan, L.R. ” An optimal batch size for a production system operating under periodic delivery policy”, Computers & Industrial Engineering, 37, 711-730 (1999).
[31] Sarkar, B. “An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production.” Applied Mathematics and Computation, 218 (17), pp. 8295-8308. (2012)
[32] Thomas D.J. and Hackman S.T. “A committed delivery strategy with fixed frequency and quantity.” European Journal of Operational Research, 148 (2), 363-373. (2003)
[33] Ting J. Lee , Singa W. Chiu , Huei H. Chang “On improving replenishment lot size of an integrated manufacturing system with discontinuous issuing policy and imperfect rework” American Journal of Industrial and Business Management,1,20-29(2011)
[34] Taleizadeh, A.A. , Wee, H.-M. , Jalali-Naini, S.G. “Economic production quantity model with repair failure and limited capacity” Applied Mathematical Modelling, . Article in Press. (2012)
[35] Tsou, J.-C. , Hejazi, S.R. , Barzoki, M.R. Economic production quantity model for items with continuous quality characteristic, rework and reject. International Journal of Systems Science, 43 (12), pp. 2261-2267. (2012)
[36] Taft, E.W., “The most economical production lot”, The Iron Age, Vol. 101, May 30, pp.1410-1412 (1918).
[37] Widyadana, G.A., Wee, H.M. “Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time.” Applied Mathematical Modelling 35 (7),pp. 3495-3508. (2011)
[38] Wang, W.-Y.Optimum production and inspection modeling with minimal repair and rework considerations. Applied Mathematical Modelling, 37 (4), pp. 1618-1626. (2013)
[39] Yeh, T.-M. , Ting, C.-K. , Pai, F.-Y. , Yang, J.-C. “Effects of breakdown, Backlog and rework on replenishment lot size”
Research Journal of Applied Sciences, Engineering and Technology, 4 (22), pp. 4755-4760. (2012)
[40] 劉文傑,「研究含機器當機(AR型)級不良品可完全重工修復之經濟生產批量模式之最佳生產週期」,碩士論文,朝陽科技大學工管所,台中(2006)。[41] 曾建源,「含機器當機(AR型)及不完美重工程序之EPQ模式的最佳生產週期探討,碩士論文,朝陽科技大學工管所,台中(2006)。[42] 陳信維,「探討整合多樣產品生產且含不完美重工之共同週期和最佳配送策略與探討含機器當機且含不完美重工後多次配送之最佳生產時間」,碩士論文,朝陽科技大學工管所,台中(2012)[43] 宋銘玄,「求解多樣產品含部分報廢之生產系統的共通週期與配送問題與含設備當機即完全報廢之最佳生產時間」,碩士論文,朝陽科技大學工管所,台中(2012)[44] 李建華,「在供應鏈環境下探討製造商不完美重工生產系統下之(n+1)次配送策略與配送至多個購買者的最佳批量與配送次數」,碩士論文,朝陽科技大學工管所,台中(2010)[45] 鍾佳玲,「在不良品可完全重工修復與非連續性配送之生產系統下探討最佳批量與配送次數決策」碩士論文,朝陽科技大學工管所,台中(2009)[46] 黃朝治,「整合製造商與多個購買者在不完美重工生產系統之(n+1)次配送與整合多樣產品生產含隨機報廢並多次配送的最佳生產與配送策略」,碩士論文,朝陽科技大學工管所,台中(2011)。[47] 江國偉,「探討整合供應商與多個顧客在含部份報廢部分可重工修復之生產系統的(n+1)次配送與整合多樣產品生產含重工修復並多次配送的最佳生產與配送策略」,碩士論文,朝陽科技大學工管所,台中(2011)。[48] 劉尚智,「研究定量多次配送與含不良品重工失敗率因素之最佳生產批量決策」,碩士論文,朝陽科技大學工管所,台中(2007)。[49] 李俊逸,「含不良品部分可重工修復與良品分期配送之經濟生產批量最佳化」,碩士論文,朝陽科技大學工管所,台中(2007)。[50] 郭奕裕,「在供應鏈環境中生產多樣產品含報廢品n次配送策略之最佳生產週期決策」,碩士論文,朝陽科技大學工管所,台中(2011)。