參考文獻
1. Conway, R. W., W. L. Maxwell, L. W. Miller, Theory of Scheduling, Massachusetts: Addision-Wesley, 1967.
2. Cheng TCE, MC Gupta, “Survey of scheduling gresearch involving due date determination decision,” European Journal of OperationalResearch, 38, pp.156– 166, 1989.
3. Chung, S. H., M. H. Yang, C. M. Cheng, “The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories, ”IEEE Transactions on Components, Packaging, and Manufacturing Technology-Part C, 20, 4, pp.278-287, 1997.
4. Chung, S. H., H. W. Huang, “The block-based cycle time estimation algorithm for wafer fabrication, ”International Journal of Industrial Engineering, 6, 4, pp.307-316, 1999.
5. Chang, P. C., J. C. Hsieh, T. W. Liao, “A case-based reasoning approach for due-date assignment in a wafer fabrication factory, ”Proceedings of the 4th International Conference on Case-Based Reasoning, Vancouver, Canada, July 30-August 2, pp.648-659, 2001.
6. Chang, P. C., J. C. Hiseh, “A neural networks approach for due-date assignment in a wafer fabrication factory, ”International Journal of Industrial Engineering, July 2002.
7. Chen, T. “A Fuzzy Back Propagation Network for Output Time Prediction in a Wafer Fab, ”Applied Soft Computing 2/3F, pp.211-222, 2003.
8. Hwang, J. R., S. M. Chen, and C. H. Lee, “Handling forecasting problems using fuzzy time series, ”Fuzzy Sets AND Systems 100, pp.217-228, 1998.
9. H. J. Zimmermann,“FUZZY SET THEORY-AND ITS APPLICATIONS SECOND EDITION,”茂昌圖書有限公司,民國80年。
10. Juang, J. Y,. Y. C. Li, H. P. Huang, “Estimation of lot processing time in an IC fab, ”International Journal of Industrial Engineering , 6, 4, pp.317-324, 1999.
11. Jiawei Han, Micheline Kamber, “Data Mining: Concepts and Techniques,” Morgan Kaufmann, 2000.
12. Kimoto, T. and K. Asakawa, “Stock market prediction system with modular neural network, ”IEEE International Joint Conference on Neural Network, pp.1-6, 1990.
13. Lee, C. E., Y. J. Chang, “A bottleneck-based due-date assignment methodology, ”Submitted to International Jorunal of Manufacturing Technology and Management, Accepted.
14. Wang Li-Xin, Jerry M. Mendel, “Generating Fuzzy rules by Learning form Examples,” IEEE Transaction on Systems, Man, and Cybernetics, 22, pp.1414-1427, 1992.
15. Wang Li-Xin, Jerry M. Mendel, “Generating fuzzy rules by learning from examples,” TheFirst IEEE international Conference on Fuzzy Systems, 22, pp.203-210, 1992.
16. Liao, T. W., "Classification of Welding Flaw Types with Fuzzy Expert Systems," Expert Systems with Applications, 25, pp.101-111, 2003.
17. Raghu, T. S., C. Rajendran, “Due-date setting methodologies based on simulated annealing-an experimental study in a real-life job shop, ” International Journal of Production Research, 33, 9, pp.2535-2554, 1995.
18. Smith, M. L., A. Sediman, “Due date selection procedure for job-shop simulation, ”Computers and Industrial Engineering, 7, pp.199-207, 1983.
19. Taylor Ⅲ, B. W., L. J. Moore, “Estimated job flow-time in ajob shop for contractually negotitated due-dates,” Operational Research Society, 33, 9, pp.845-854, 1982.
20. Tawfiq, A. S. & E. A Ibrahim, “ Artificial neural networks as applied to long-term demand forecasting, ” Artificial Intelligence in Engineering, Vol. 13, pp.189-197, 1999.
21. Vig, M. M., K. J. Dooley, “Dynamic rules for due-dates assignment, ”Management Science, 25, pp.363-373, 1979.
22. Week, J. K., “A simulation study of predictable due-dates, ”Management Science, 25, pp.363-373, 1979.
23. Xiang Li, Cheng-Leong Ang and Robert Gray, “An Intelligent Business Forecaster for Strategic Business Planning,”Journal of Forecasting, 18, pp.181-204, 1999.
24. Liu X., Bing W. Kwan, and Simon Y. Foo, “Time Series Principles,”FAMU-FSU College of Engineering, 2004.
25. 朱震家,「晶圓廠之交期指定-應用類神網路」,私立元智大學工業工程與管理研究所碩士論文,1999。26. 江珊,「用模糊預測系統預測領先指標綜合指數」,淡江大學資訊工程學系,2002年碩士論文。27. 周湘蘭,「類神經網路在多重產品需求預測上之應用」,元智大學工業工程與管理學系,2002年碩士論文。28. 林豐隆,「生產與服務作業管理」,揚智文化,2004。
29. 許維宸,「應用聚類技術於模糊資料萃取方法之研究」,台北科技大學生產系統工程與管理研究所碩士論文,2001。30. 葉怡成,「類神經網路模式應用與實作」,儒林圖書,2003。
31. 郭秀敏,「模糊倒傳遞網路於印刷電路板生產預測之運用」,私立元智大學工業工程與管理研究所碩士論文,2004。32. 楊雯寧,「台灣股價指敗預測模型之探討」,私立元智大學工業工程與管理研究所碩士論文,2001。33. 劉凱文,「製造業交期指定模式之探討-以IC封裝業為例」,私立元智大學工業工程與管理研究所碩士論文,1998。34. 鍾順傳,「模糊時間數列預測」義守大學工業管理學系,2001年碩士論文。35. 鄭照明,「晶圓製造廠交期指定模式之構建」,國立交通大學工業工程研究所碩士論文,1996。36. 顏月珠,「應用統計學」,三民書局,2001。
37. 鐘文杰,「整合自組織映射圖網路與遺傳演法為輔之K-Means於顧客關係管理中」,國立台北科技大學生產系統工程與管理研究所碩士論文,2001。