參 考 文 獻
1. Anderson, M. T., B. S. Greenberg and S. L. Stokes,” Acceptance Sampling With Rectification When Inspection Errors Are Present,” Journal of Quality Technology, Vol. 33, No. 4, pp.493-505, 2001.
2. Barlow, R. E. and X. Zhang,” A Critique of Deming’s Discussion of Acceptance Sampling Procedure,” In: A.P. Basu, Ed., Reliability and Quality and Control, North-Holland, Amsterdam, pp21-32, 1986.
3. Barlow, R. E. and X. Zhang,” Bayesian Analysis of Inspection Sampling Procedures Discussed by Deming,” Journal of Statistical Planning and Inference, Vol.16, North-Holland, 1987.
4. Burke, R. J., D.D. Robert and F.C. Kaminsky,” The (k1, k2) game,” Quality Progress, Vol. 26, No. 2, pp.49-53, 1993.
5. Deming, W. E.,” Quality, Productivity, and Competitive Position,” Massachusetts Institute of Technology, Center for Advanced Engineering Study, Cambridge, MA, 1982.
6. Kaminsky, F. C. and K. R. Haberle,” Probability Distributions for the Deming Cost Models,” Journal of Quality Technology, Vol. 27, No. 4, pp.355-362, 1995.
7. Lam, Y. and C. V. Lam,” Bayesian double-sampling plans with normal distributions,” The Statistician, Vol. 46, No. 2, pp.193-207, 1997.
8. Lorenzen, T. J.,“ Minimum Cost Sampling Plan Using Bayesian Methods,” Naval Research Logistics Quarterly, Vol. 32, No. 1, pp.57-69, 1985.
9. Moskowitz, H. and K. Tang,” Bayesian Variables Acceptance- Sampling Plans: Quadratic Loss Function and Step-Loss Function,” Technometrics, Vol. 34, No. 3, pp. 340-347, 1992
10. Papadakis, E. P.,” The Deming Inspection Criterion for Choosing Zero or 100 Percent Inspection,” Journal of Quality Technology, Vol. 17, No. 3, pp.121-127, 1985.
11. Rigdon, S. E.,” Mood’s Theorem, Deming’s kp Rule, and The Death of Acceptance Sampling,” Quality Engineering, Vol. 8, No. 1, pp.129-136, 1995
12. Shachter, R. D., ” Evaluating Influence Diagrams,” Operations Research, Vol. 34, pp.871-882, 1986.
13. Sheil, J.,” Towards economically optimal first-off inspection,” European Journal of Operational Research, Vol. 94, pp.179-185, 1996.
14. Vander Wiel, S. A. and S. B. Vardeman,” A Discussion of All-or-None Inspection Policies,” Technometrics, Vol. 36, No. 1, pp.102-109, 1994
15. 林鴻欽,「貝氏檢驗計劃之設計」,元智大學工業工程研究所碩士論文,1992年6月。16. 林世偉,「不可修復產品原料供應商之選擇─貝氏決策模式」,元智大學工業工程研究所碩士論文,1998年6月。17. 徐旭昇,「可拆解再裝配產品之貝氏檢驗模式」,Journal of the Chinese Institute of Industrial Engineers, Vol. 16, No.2, pp.195-207, 1999。
18. 邵嘉瑀,「變異數不確定下計量型戴明抽樣檢驗模式之貝氏分析」,元智大學工業工程研究所碩士論文,2002年6月。