|
[1] Ahmadi, J.H., Ahmadi, R.H., Dasu, S., and Tang, C.S., 1992. Batching and scheduling jobs on batch and discrete processors, Operations Research, 40, 750-763. [2] Baker, K.R., 1974. Introduction to Sequencing and Scheduling, John Wiley & Sons Inc., New York. [3] Chand, S., Tuaub, R., and Uzsoy, R., 1996. Single-machine scheduling with dynamic arrivals: Decomposition results and an improved algorithm, Naval Research Logistics, 43, 709-719. [4] Chandru, V., Lee, C.-Y, and Uzsoy, R., 1993. Minimizing total completion time on a batch processing machines, International Journal of Production Research, 31, 2097-2121. [5] Chandru, V., Lee, C.-Y, and Uzsoy, R., 1993. Minimizing total completion time on a batch processing machines with job families, Operations Research Letters, 13, 61-65. [6] Coffman, E.G., Yannakakis, M., Magazine, M.J., and Santos C., 1990. Batch sizing and job sequencing on a single machine. Annals of Operations Research, 26, 135-147. [7] Ng Daniel, C.T., Cheng, T.C.E. and Kovalyov, M.Y., 2004. Single machine batch scheduling with jointly compressible setup and processing times, European Journal of Operational Research, 153, 211-219. [8] Dessouky, M.I. and Deogun, J.S., 1981. Sequencing jobs with unequal ready times to minimize mean flow time, SIAM J. Comput., 10, 192-202. [9] DuPont, L. and Dhaenens-Flipo, C., 2002. Minimizing the makespan on a batch machine with non-identical jobs sizes: an exact procedure, Computers & Operations Research, 29, 807-819. [10] DuPont, L. and Ghazvini, F.J., 1997. A branch and bound algorithm for minimizing mean flow time on a single batch processing machine, International Journal of Industrial Engineering, 4, 197-203. [11] Ghazvini, F.J. and DuPont, L., 1998. Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes, International Journal of Production Economics, 55, 273-280. [12] Hochbaum, D.S. and Landy, D., 1997. Scheduling semiconductor burn-in operations to minimize total flowtime, Operations Research, 45, 874-885. [13] Kempf, K.G., Uzsoy, R., and Wang, C.-S., 1998. Scheduling a single batch processing machine with secondary resource constraints, Journal of Manufacturing System, 17, 37-51. [14] Lee, C.Y., Uzsoy, R. and Martin-Vega, L.A., 1992. Efficient algorithms for scheduling semiconductor burn-in operations, Operations Research, 40, 764-774. [15] Lee, C.Y. and Uzsoy, R., 1999. Minimizing makespan on a single batch processing machine with dynamic job arrivals, International Journal of Production Research, 37, 219-236. [16] Li, C.L. and Lee, C.Y., 1997. Scheduling with agreeable release times and due dates on a batch processing machine, European Journal of Operational Research, 96, 564-569. [17] Melouk, S., Damodaran, P. and Chang, P.Y., 2004. Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing, International Journal of Production Economics, 87, 141-147. [18] Sung, C.S. and Choung, Y.I., 2000. Minimizing makespan on a single burn-in oven in semiconductor manufacturing, European Journal of Operational Research, 120, 559-574. [19] Sung, C.S., Choung, Y.I., Hong, J.M., and Kim, Y.H., 2002. Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals, Computer & Operations Research, 29, 995-1007. [20] Uzsoy, R., 1994. Scheduling a single batch processing machine with non-identical job sizes, International Journal of Production Research, 32, 1615-1635. [21] Wang, C.S., and Uzsoy, R., 2002. A genetic algorithm to minimize maximum lateness on a batch processing machine, Computers & Operations Research, 29, 1621-1640. [22] Zhang, G., Cai, X., Lee, C.-Y., and Wong, C.K., 2001. Minimizing makespan on a single batch processing machine with nonidentical job sizes, Naval Research Logistics, 48, 226-240.
|