1.劉志宏,「不確定加工時間之平行機台排程」,清華大學工業工程與工程管理研究所,碩士論文 (1999)。2.田國興,「有設置時間之流程型工廠多階段平行機台總排程時間最小化問題」,中原大學工業工程研究所,碩士論文 (1999)。3.徐智遠,「DRAM模組廠SMT線排程問題之研究」,台灣科技大學工業管理研究所,碩士論文 (2006)。4.張偉立,「利用分之界限法求解多資源零工事生產排程」,清華大學工業工程與工程管理研究所,碩士論文 (2004)。5.林淳菁,「應用遺傳基因演算法求解不相關平行機台之排程問題」,朝陽科技大學工業工程與管理研究所,碩士論文 (2000)。6.吳思農,「模擬退火法於有限資源下不相關平行機台排程問題之應用」,元智大學工業工程與管理研究所,碩士論文 (2005)。7.蕭陳鴻,「基因演算法於非等效平行機台排程之應用」,元智大學工業工程研究所,碩士論文 (2000)。8.葉麗芬,「雙目標非等效平行機台排程問題之探討」,元智大學工業工程與管理研究所,碩士論文 (2001)。9.鄭志傑,「基因演算法於有限資源下不相關平行機台排程問題之應用」,元智大學工業工程與管理研究所,碩士論文 (2006)。10.Allahverdi, A. and J. Mittenthal, “Scheduling on M parallel machines subject to random breakdowns to minimize expected mean flow time,” Naval Research Logistics, 41, 677-682 (1994).
11.Anagnostopoulos, G. C. and G. Rabadi, “A simulated annealing algorithm for the unrelated parallel machine scheduling problem,” Proceeding of the world automation congress, Orlando, Florida, June 9-13 (2002).
12.Azizoglu, M. and O. Kirca, “Tardiness minimization on parallel machines ,” International Journal of production Economics, 55, 163-168(1998)
13.Azizoglu, M. and O. Kirca, “Scheduling jobs on unrelated parallel machines to minimize regular total cost functions,” IIE Transactions, 31, 153-159 (1999).
14.Azizoglu, M. and S. Webster, “Scheduling parallel machines to minimize weighted flowtime with family set-up times,” International Journal of Production Research, 41, 1199-1215(2003).
15.Baker, K. R., Introduction to Sequence and Scheduling (John Wiley & Sons, New York, NY 1974).
16.Bank, F., “Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties,” Mathematical and Computer Modeling, 33, 363-383 (2001).
17.Barker, J. R., and G. B. McMahon, “Scheduling the general job-shop,” Management Science, 31, 594-598(1985).
18.Dastidar, S. G. and R. Nagi, “Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs,” Computers & Operations Research, 32, 2987-3005 (2005).
19.Davis, E. and J. M. Jaffe, “Algorithms for scheduling tasks on unrelated processors,” Journal of Association for Computing Machinery, 28, 721-736 (1981).
20.Dessouky, M. M., “Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness,” Computers & Industrial Engineering, 34, 793-803, (1998).
21.Dunstall, S. and A. Wirth, “A comparaisoms for a family scheduling problem with identical parallel machinesn of branch-and bound algorith,” European Journal of Operational Research, 167, 283-296 (2005).
22.Ghedjati, F., “Genetic algorithms for the job-shop scheduling problem with parallel constraints: heuristic mixing method machines and precedence,” Computers & Industrial Engineering, 37, 39-42 (1999).
23.Graham, R. L., E. L. Lawler, J. K. Lenstra and A. H. K. Rinnooy Kan, “Optimization and approximation in deterministic sequence and scheduling theory: a survey,” Annals of Discrete Mathematics, 5, 287-326 (1979).
24.Kim, D., K. Kim, W. Jang and F. Chen, “Unrelated parallel machine scheduling with setup times using simulated annealing,” Robotics and Computer Integrated Manufacturing, 18, 223-231 (2002).
25.Kim, D., D. Na and F. Chen, “Unrelated parallel machines scheduling with setup times and a total weighted tardiness objective,” Robotics and Computer Integrated Manufacturing, 19, 173-181 (2003).
26.Lageweg, B. J., J. K. Lenstra, and A. H. G. Rinnooy Kan, “Job-shop scheduling by implicit enumeration,” Management Science, 24 , 441-450(1977).
27.Lee, H. and M. Guignard, “A hybrid bounding procedure for the workload allocation problem on parallel unrelated machines with setups,” Journal of the Operational Research Society, 47, 1247-1261 (1996).
28.Liaw, C., Y. Lin, C. Cheng and C. Minchin, “Scheduling unrelated parallel machines to minimize total weight tardiness,” Computers & Operations Research, 30, 1777-1789 (2003).
29.Martello, S., F. Soumis and P. Toth, “Exact and approximation algorithms for makespan minimization on unrelated parallel machines,” Discrete Applied Mathematics, 75, 169-188 (1997).
30.Piersma, N. and W. Dijk, “A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search,” Mathematical and Computer Modeling, 24, 11-19 (1996).
31.Shim, S. –O. and Y. –D. Kim, “Minimizing total tardiness in an unrelated parallel-machine scheduling problem,” Journal of the Operational Research Society, 58 (3), 346-354 (2006).
32.Srivastava, B., “An effective heuristic for minimizing makespan on unrelated parallel machines,” The Journal of the Operational Research Society, 49, 886-894 (1998).
33.Schutten, J. M. J. and R.A.M. Leussink, “Parallel machines scheduling with release date, due dates and family setup times,” International journal of Production Economics, 46-47, 119-125 (1996).
34.Yalaoui, F. and C. Chu, “New exact method to solve the Pm/rj/∑Cj schedule problem ,” International Journal of Production Economics, 100, 168-179 (2006).