1.朱玉芬(2000),「應用基因演算法在專業IC設計業的供應鏈生產排程之研究」,輔仁大學資訊管理學系碩士論文2.諶承正(2000),「運用系統模擬與基因演算法執行限制理論於流線型生產」,國立台北科技大學生產系統工程與管理研究所碩士論文3.趙文涼(2000),「基因演算法於單機交期絕對偏差及整備成本最小化排程問題之應用」,元智大學工業工程研究所碩士論文4.林唐任(2002),「資源限制下關係不固定排程尋優模式之探討」,國立台灣科技大學碩士論文5.駱景堯(2002),「流程型工廠排程與接單策略研究-以型鋼業為例」,大葉大學工業工程研究所碩士論文
6.黃漢強(2003),「混合式基因演算法應用於不等待零工廠問題之研究」,國立台灣科技大學碩士論文7.王治平(2003),「實際零工式生產排程問題的派工法則」,國立政治大學資訊管理研究所碩士論文8.賴勇見(2005),「應用系統模擬於鞋模具生產與派工之探討」,雲林科技大學工業工程與管理研究所碩士論文9.莊文化(2006),「應用基因演算法於彈性流線型工廠排程之研究」,國立成功大學工業與資訊管理系碩士論文10.陳明晏(2007),「利用Pareto Front求解預拌車派送之最佳化排程」,朝陽科技大學碩士論文11.Baker, K. R. (1974), Introduction to Sequencing and Scheduling, Wiley, New York.
12.Baker, K. R.(1984), “Sequencing rules and due-date assignments in a job shop”, Management Science, Vol.30, No.9, pp.1093-1104.
13.Boctor, F. F.(1990), “Some Efficient Multi-heuristic Processdures for Resource-constrained Project Scheduling”, European Journal of Operational Research, Vol.49, pp.3-13.
14.Blackstone, J. H., Phillips, D. T., and Hogg, G. L. (1982), “A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations”, International Journal of Production Research, Vol. 20, No.1, PP.27-45.
15.Brucker, P. (1995), Scheduling Algorithms, Springer, Berlin.
16.Chang, P. C., Hsieh, J. C. and Lin, S. G.(2002), “The Development of Gradual Priority Weighting Approach for the Multi-Objective Flowshop Scheduling Problem”, International Journal of Production Economics, Vol.79, No.3, pp.171-181,
17.French, S., Sequencing and Scheduling (1982), An Introduction to the Mathematics of the Job-Shop, Ellis Horwood, Chichester, UK.
18.Gen, M. and Cheng R.,(1997), Foundations of Genetic Algorithms, Genetic Algorithms & Engineering Design, John Wiley & Sons, Inc., New York.
19.Graham, R. L., Lawler, E.L., Lenstra, J. K., and Rinnooy Kan, A. H. G. (1979), “Optimization and approximation in deterministic sequencing andscheduling: a survey”, Annals of Discrete Mathematics, Vol. 5, pp.287–326.
20.Goldberg, D. E.(1989), Genetic algorithms in search, optimization and machine learning, Addison-Wesley, Mitcheel.
21.Haupt, R. (1989), “A survey of priority rule-based scheduling”, OR Spektrum, Vol.11, pp.3-16.
22.Hunsucker, J. L. and Shah, J. R. (1994), “Comparative performance analysis of priority rules in a constrainted flow shop with multiple processors”, European Journal of Operational Research, Vol.72, pp.102-114.
23.Holthaus, O. and Rajendran , C. (1997), “New dispatching rules for scheduling in a job shop-an experimental study”, International Journal of Advanced Manufacturing Technology, Vol.13, No.2, pp.148-153.
24.Jain, A. S. and Meeran, S. (1998), “Deterministic job-shop scheduling: past, present and future”, European Journal of Operational Research, Vol.113, pp.390-434.
25.Jayamohan, M. S. and Rajendran, C. (2004), “Development and analysis of cost-based dispatching rules for job shop scheduling”, European Journal of Operational Research, Vol.157, pp.307-321.
26.Jones, A. and Rabelo, L. C. (1998), Survey of job shop scheduling techniques, NISTIR, National Institute of Standards and Technology, Gaithersburg, MD.
27.Kelley, J. E. (1963), The Critical Path Method: Resources Planning and Scheduling, Ch. 21 in Industrial scheduling, Prentice-Hall, Englewood Cliffs, New Jersey.
28.Kolisch, R. (1996), “Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation”, European Journal of Operational Research, Vol.90, pp.320-333.
29.Lawler, E. L., Lenstra, J. K., Rinnooy Kan, A. H. G., and Shmoys D. B. (1993), “Sequencing and scheduling: algorithms and complexity”, Handbooks in Operations Research and Management Science, Vol. 4.
30.Narasimhan, S. L. and Panwalker, S. C. (1984), “Scheduling in a two-stage manufacturing process”, International Journal of Production Research, Vol.22, pp.555-564.
31.Narasimhan, S. L. and Mangiameli, P. M. (1987), “A comparison of sequencing rules for a two-stage hybrid flow shop”, Decision Sciences, Vol.18, pp.250-265.
32.Nowicki, E. and Smutnicki, C. (1998), “The flow shop with parallel machines : A tabu search approach”, European Journal of Operational Research, Vol.106, pp.226-253.
33.Petroni, A. and Rizzi, A. (2002), “A fuzzy logic based methodology to rank shop floor dispatching rules”, International Journal of Production Economics, Vol.76, pp.99-108.
34.Pinedo, M. (1995), Scheduling theory, algorithm, and systems, New Jersey: Prentice Hall
35.Rajendran, C., and Holthaus, O. (1999), “A comparative study of dispatching rulesin dynamic flowshops and jobshops”, European Journal of Operational Research, Vol.116, pp.156-170.
36.Rinnooy Kan, A. H. G. (1976), Machine Scheduling Problems, Martinus Nijhoff, The Hague.
37.Sarper, H. and Henry, M. C. (1996), “Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop”, Omega, Vol.24, No.1, pp.73-81.
38.Sridhar, J. and Rajendran, C. (1993), “Scheduling in a cellular manufacturing system:a simulated annealing approach”, International Journal of Production Research, Vol.31, pp.2927-2945
39.Tormos, P. and Lova, A. (2001), “A competitive heuristic solution technique for resource-constrained project scheduling”, Annals of Operations Research, Vol.102, pp.65-81.
40.Veral, E. A. and Moha, R. P. (1999), “A two-phased approach to setting due-dates in singlemachine job shops”, Computers and Industrial Engineering, Vol36, pp.201-218.